Common use of 3D Model Clause in Contracts

3D Model. ‌ 36 Developer shall prepare 3D Models that contain existing conditions in 3D format and the proposed 37 3D key design features. 3D Models are virtual models that contain representations of physical 38 objects in 3D (x, y, and z) as surfaces or solids. 3D Models must include existing conditions 39 model(s), design model(s), and construction model(s). 40 The existing condition 3D Model(s) must contain existing ground surface and certain subsurface 41 elements including drainage structures, utilities and zones of protection, and bridge and wall 42 foundations, shown on the Plans or the existing ground surface data (*.dtm).

Appears in 1 contract

Sources: Design Build Maintain Agreement

3D Model. 36 29 Developer shall prepare 3D Models that contain existing conditions in 3D format and the 30 proposed 37 3D key design features. 3D Models are virtual models that contain representations of 31 physical 38 objects in 3D (x, y, and z) as surfaces or solids. 3D Models must include include, but are not limited 32 to existing conditions 39 model(s), design model(s), and construction model(s). 40 33 The existing condition 3D Model(smodel(s) must contain existing ground surface and certain subsurface 41 34 elements including drainage structures, utilities and zones of protection, and bridge and wall 42 35 foundations, shown on the Plans or the existing ground surface data (*.dtm).

Appears in 1 contract

Sources: Design Build Maintain Agreement

3D Model. 36 29 Developer shall prepare 3D Models that contain existing conditions in 3D format and the 30 proposed 37 3D key design features. 3D Models are virtual models that contain representations of 31 physical 38 objects in 3D (x, y, and z) as surfaces or solids. 3D Models must include include, but are not limited 32 to existing conditions 39 model(s), design model(s), and construction model(s). 40 Construction 33 model(s) must contain temporary site features and equipment (e.g. detours, temporary signals, 34 utility excavations, false work, etc.) 35 The existing condition 3D Model(smodel(s) must contain existing ground surface and certain subsurface 41 36 elements including drainage structures, utilities and zones of protection, and bridge and wall 42 37 foundations, shown on the Plans or the existing ground surface data (*.dtm).

Appears in 1 contract

Sources: Design Build Maintain Agreement