Benchmark Unavailability Period Upon the Borrower’s receipt of notice of the commencement of a Benchmark Unavailability Period, the Borrower may revoke any pending request for a SOFR Borrowing of, conversion to or continuation of SOFR Loans to be made, converted or continued during any Benchmark Unavailability Period and, failing that, the Borrower will be deemed to have converted any such request into a request for a Borrowing of or conversion to Base Rate Loans. During a Benchmark Unavailability Period or at any time that a tenor for the then-current Benchmark is not an Available Tenor, the component of Base Rate based upon the then-current Benchmark or such tenor for such Benchmark, as applicable, will not be used in any determination of Base Rate.
Inability to Determine Eurodollar Rate In the event, prior to the commencement of any Interest Period relating to any Eurodollar Rate Loan, the Administrative Agent shall determine or be notified by the Required Lenders that adequate and reasonable methods do not exist for ascertaining the Eurodollar Rate that would otherwise determine the rate of interest to be applicable to any Eurodollar Rate Loan during any Interest Period, the Administrative Agent shall forthwith give notice of such determination (which shall be conclusive and binding on the Borrower and the Lenders) to the Borrower and the Lenders. In such event (a) any Loan Request or Conversion Request with respect to Eurodollar Rate Loans shall be automatically withdrawn and shall be deemed a request for Base Rate Loans, (b) each Eurodollar Rate Loan will automatically, on the last day of the then current Interest Period relating thereto, become a Base Rate Loan, and (c) the obligations of the Lenders to make Eurodollar Rate Loans shall be suspended until the Administrative Agent or the Required Lenders determine that the circumstances giving rise to such suspension no longer exist, whereupon the Administrative Agent or, as the case may be, the Administrative Agent upon the instruction of the Required Lenders, shall so notify the Borrower and the Lenders.
Payment in the Event Losses Fail to Reach Expected Level On the date that is 45 days following the last day (such day, the “True-Up Measurement Date”) of the calendar month in which the tenth anniversary of the calendar day following the Bank Closing occurs, the Assuming Bank shall pay to the Receiver fifty percent (50%) of the excess, if any, of (i) twenty percent (20%) of the Stated Threshold less (ii) the sum of (A) twenty-five percent (25%) of the asset premium (discount) plus (B) twenty-five percent (25%) of the Cumulative Shared-Loss Payments plus (C) the Cumulative Servicing Amount. The Assuming Bank shall deliver to the Receiver not later than 30 days following the True-Up Measurement Date, a schedule, signed by an officer of the Assuming Bank, setting forth in reasonable detail the calculation of the Cumulative Shared-Loss Payments and the Cumulative Servicing Amount.
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.
Emergency Thresholds The following matrix presents the emergency thresholds that, if reached by any of the services mentioned above for a TLD, would cause the emergency transition of the Registry for the TLD as specified in Section 2.13 of this Agreement. DNS Service (all servers) 4-hour total downtime / week DNSSEC proper resolution 4-hour total downtime / week EPP 24-hour total downtime / week RDDS (WHOIS/Web-based WHOIS) 24-hour total downtime / week Data Escrow Breach of the Registry Agreement as described in Specification 2, Part B, Section 6.