Abbreviated Documentation Requirements Clause Samples

Abbreviated Documentation Requirements. Compile and submit:

Related to Abbreviated Documentation Requirements

  • Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;

  • Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

  • Construction Requirements The Contractor shall coordinate with the Irrigation Company prior to beginning any construction that affects the operation or flow of the ditch. Ditch flows for ▇▇▇▇▇ Ditch occur yearlong. Generally, ditch flows for the Picketwire Ditch occur between April 1st – October 15th with additional occurrences in December and March for livestock watering. Working windows for demolition and construction shall be coordinated with the ▇▇▇▇▇ Ditch Company and Picketwire Ditch Company along with their inspectors. The Contractor shall cooperate with the Irrigation Company where Work is within the limits of the Irrigation Company’s property interest and shall perform the Work in such a manner and at such times as not to endanger or interfere with the continuous operation of the canal, property, and the flow of water at or in the vicinity of the Work. No Work shall be performed that interferes with the deeded schedule and volume of flow of the canal, including the delivery of water to its shareholders. The Contractor shall be responsible to the Irrigation Company for all damages for delays that may be sustained by the Irrigation Company caused by any interference that could have been avoided by proper handling of the Work. The Contractor shall obtain Irrigation Company’s approval, in writing, of construction for all of the elements of the Work within the Irrigation Company’s property interest. Copies of such approvals, notices, and correspondence shall be submitted to CDOT for Acceptance prior to beginning any Work on Irrigation Company property interest. The Contractor shall through the owner-controlled insurance program (OCIP) indemnify the Irrigation Company under its insurance coverage during the construction phase. Upon completion of the Work to be performed within Irrigation Company property interest, the Contractor shall promptly remove all tools, Equipment, Materials, and debris from Irrigation Company property placed there by the Contractor or the Contractor’s agents. The Contractor shall restore said property to the same state and condition as when the Contractor entered ▇▇▇▇▇▇▇, and shall leave said property in a clean and presentable condition satisfactory to the Irrigation Company. The Contractor shall provide As-Constructed Documents to the Irrigation Company within 10 Days of completion of Work within the Irrigation Company property interest.

  • Certification Requirements The applicant will provide Vista Laboratories, Inc. with all product information for the evaluation of the product to be certified and warrant that the information provided is accurate and complete so that Vista Labs may perform the services requested. If the product was tested at an external laboratory, the applicant must provide the complete test report to Vista Labs. If the external testing facility is not ISO 17025 accredited, or does not have the proper scope, Vista Labs must determine if the test report can be used for certification activities. The applicant’s information is used to perform a product review and evaluation to determine the product’s compliance to the specific certification requested. Throughout the process, the client agrees to make claims regarding certification consistent with the scope of certification. The applicant agrees to supply the required number of product samples, to be determined by Vista Labs, to the laboratory for testing, measurement, and evaluation purposes. The client understands that certain tests may damage or destroy the sample and acknowledge that Vista Labs is not responsible for such damages. Samples will be returned only upon request by the applicant and at the applicant’s expense, after the completion of certification. Samples will be disposed of after six months if not requested for return by applicant. The product is ineligible for certification if it has been modified by the client after testing or certification. Changes to the product must be approved by Vista Laboratories. Vista Labs reserves the right to re- evaluate the product as a result of information that raises questions concerning the conformance of the product. Certified products maintain fulfilment of product requirements if the certification applies to ongoing production. If the client provides copies of the certification documents to other parties, the documents are reproduced in their entirety, or as specified in the certification scheme. In making reference to its product certification in media, such as brochures or advertisement, the client complies with the requirements of the Vista Labs or as specified by the certification scheme. The client complies with any requirements that may be prescribed in the certification scheme relating to the use of marks of conformity, and on all product correspondences and product related information. Vista Labs reserves the right to revise or withdraw the requirements as required in order to maintain conformance with FCC rules and regulations governing the product. The product may continue with certification and receive certification upon demonstration of compliance with the revised requirements, to the satisfaction of Vista Laboratories.