Common use of Acceptability Clause in Contracts

Acceptability. In the event that significant voids are suspected in the concrete that were created during placement, verify the integrity of the caisson using a method that has been approved by the Engineer. If the caisson in question is found to be structurally deficient or out of tolerance in any way, the caisson will not be accepted unless corrective measures as approved by the Engineer are accomplished. Furnish additional materials and work necessary to effect corrections at no cost to the Department and with no increase in contract time. 1. Demonstration caisson: The demonstration test of procedures will include any material, labor, equipment, etc. required for the assembly and installation of the demonstration drilled caisson. All related work to be paid for under this Specification will be performed under the direction of the Engineer. Include all costs associated with the installation and removal of the demonstration caisson in the bid price for the demonstration caisson.

Appears in 2 contracts

Sources: Contract Amendment, Amendment to Contract