Acceptance Tests; Corrections Clause Samples

Acceptance Tests; Corrections. Promptly after the Installation Date Customer shall perform the tests specified in the Purchase Order or other attachments (hereinafter referred to as the “Acceptance Tests”), during the time period specified to determine whether: (i) the Developed Software meets the specifications and performance standards and (ii) the system performs repetitively on a variety of data without failure. Upon completion of the last phase, the Acceptance Tests shall be performed on the system as a whole in order to determine whether the integration of the Developed Software and any necessary equipment meets the specifications for the system set forth herein and operates with internal consistency. In the event that the Acceptance Tests establish that the Developed Software does not perform in accordance with such specifications and performance standards, or the system as a whole fails to satisfy performance specifications appropriate to its stage of completion when tested, Customer shall forthwith notify Vendor and Vendor shall within the time period set forth in the Purchase Order or other attachments, modify or improve the Developed Software delivered to Customer, at Vendor’s expense, to ensure that the Developed Software and the system as a whole perform in accordance with the aforesaid specifications and performance standards. Customer shall thereafter have a second test period of equal duration to reconduct the Acceptance Tests. Failure of the Developed Software to meet the aforesaid specifications and performance standards after the second set of Acceptance Tests shall constitute a default by Vendor under Section 15(B) hereof.
Acceptance Tests; Corrections. The parties shall follow the procedure for acceptance of the System shall be as set forth in Attachment D hereto (“System Acceptance Procedure”).

Related to Acceptance Tests; Corrections

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that:

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.