ACSF of Category B1 operation Sample Clauses

ACSF of Category B1 operation. 5.6.2.2.1. If the system is active an optical signal shall be provided to the driver. 5.6.2.2.2. When the system is in standby mode, an optical signal shall be provided to the driver. 5.6.2.2.3. When the system reaches its boundary conditions set out in paragraph 5.6.2.3.1.1. of this Regulation (e.g. the specified maximum lateral acceleration aysmax) and both in the absence of any driver input to the steering control and when any front tyre of the vehicle starts to cross the lane marking, the system shall continue to provide assistance and shall clearly inform the driver about this system status by an optical warning signal and additionally by an acoustic or haptic warning signal. For vehicles of categories M2 M3 N2 and N3, the warning requirement above is deemed to be fulfilled if the vehicle is equipped with a Lane Departure Warning System (LDWS) fulfilling the technical requirements of UN Regulation No. 130. 5.6.2.2.4. A system failure shall be signalled to the driver by an optical warning signal. However, when the system is manually deactivated by the driver, the indication of the failure may be suppressed. 5.6.2.2.5. When the system is active and in the speed range between 10 km/h or Vsmin, whichever is higher, and Vsmax, it shall provide a means of detecting that the driver is holding the steering control. If, after a period of no longer than 15 seconds the driver is not holding the steering control, an optical warning signal shall be provided. This signal may be the same as the signal specified below in this paragraph. The optical warning signal shall indicate to the driver to place their hands on the steering control. It shall consist of pictorial information showing hands and the steering control and may be accompanied by additional explanatory text or warning symbols - see examples below: If, after a period of no longer than 30 seconds the driver is not holding the steering control, at least the hands or steering control in the pictorial information provided as optical warning signal shall be shown in red and an acoustic warning signal shall be provided. The warning signals shall be active until the driver is holding the steering control, or until the system is deactivated, either manually or automatically. The system shall be automatically deactivated at the latest 30 seconds after the acoustic warning signal has started. After deactivation the system shall clearly inform the driver about the system status by an acoustic emergency signal which i...

Related to ACSF of Category B1 operation

  • Client Categorisation 4.1. The client understands and accepts that each category of Clients has its individual level of regulative protection acknowledging that Retail Clients have the highest level of protection whereas Professional Clients and Eligible Counterparties are considered to be more experienced, informed, skilled and able to estimate their risk, therefore are provided with a lower level of protection. 4.2. The Company will treat the Client as a Retail Client, Professional Client or Eligible Counterparty, depending on how the Client completes the Application Form and according to the method of categorisation as this method is explained under the title “Client Categorisation” (Appendix II), and by accepting this Agreement the Client accepts application of such method. 4.3. The Client accepts that when categorising the Client and dealing with him, the Company will rely on the accuracy, completeness and correctness of the information provided by the Client in his Application Form and the Client has the responsibility to immediately notify the Company in writing if such information changes. 4.4. The Company has the right to review the Client’s Categorisation and change his Categorisation if this is deemed necessary (subject to Applicable Laws).

  • Employee Categories All employees fall into one or the other of four principal categories as outlined below.

  • Criminal History Category With regard to determining defendant’s criminal history points and criminal history category, based on the facts now known to the government, defendant’s criminal history points equal zero and defendant’s criminal history category is I.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is a NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASPP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram, , the English Language Proficiency Assessments for California (“ELPAC”), and as appropriate to the student, and mandated by LEA pursuant to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. ▇▇▇ shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by ▇▇▇.