Common use of ADDITIONAL SERVICES SCOPE OF WORK Clause in Contracts

ADDITIONAL SERVICES SCOPE OF WORK. The Consultant Team will assist in the creation of a Northside Downtown Riverfront Parks and Trails Conceptual Master Plan for select parks in accordance with Missoula’s Downtown Master Plan. The Conceptual Master Plan will involve both the Missoula Parks and Recreation Department (the City) and the Consultant Team. The Consultant Team will focus on ▇▇▇▇ ▇▇▇▇ Park, East Caras Park, and Caras Park. Planning for the River Trail will involve a consideration of how the Northside Riverfront Downtown Parks and Trails will connect east to the Van Buren pedestrian crossing bridge at the University of Missoula and Hellgate Canyon, and west to North ▇▇▇▇▇▇▇ Street. The City will take the lead on Kiwanis Park, Downtown Lions Park, West Broadway Island Park, and River Access sites with assistance (as requested) from the Consultant Team. The Consultant Team will first produce Schematic Designs for ▇▇▇▇ ▇▇▇▇ Park, referencing the existing proposed concept plan as provide by Parks and Recreation, East Caras Park, and Caras Park. The Consultant Team will then work on Design Development. This phase involves projected cost estimates and Phasing Options for improvements. This will involve background investigation and information so that the pricing and phasing are reliable to coordinate with the ▇▇▇▇▇▇▇ Street Bridge reconstruction and to limit disruptions to park events. Improvements might include a more formal and attractive venue for the ▇▇▇▇▇ Fork River Market, buildout of ▇▇▇▇ ▇▇▇▇ Park, a splash pad, leisure ice, wider trails, enhanced lighting, under-bridge improvements (lighting, art, resurfacing), improved entry features for public access to the ▇▇▇▇▇ Fork River, additional amenities for river users, public art, redesign of parking facilities within the parks, renovation or replacements of plaza spaces, shelters, restroom renovation, seating areas, and more. Missoula’s Downtown Master Plan provided robust input both in-person and digitally over the span of several months. Input was received from several thousand people from a variety of backgrounds. Much of that input focused on public spaces. The Parks Section of Missoula’s Downtown Master Plan represents an overview of that input. Task 1: Survey of Caras Park, East Caras Park, and ▇▇▇▇ ▇▇▇▇ Park. Other tasks will occur concurrent to the survey.  Unmanned Aerial Vehicle (UAV) survey supplemented by a conventional ground survey.  1-foot contours for the sites which would be checked against topographic measurements by the ground survey.  The survey will identify platted boundaries, property ownership, and verification of adequate easements, pertinent site features and topography under cover of vegetation, and the ▇▇▇▇▇▇▇ Street bridge. It is important to note that this scope does not provide for a full boundary survey; as it would take a considerable cost and effort to retrace the entirety of the park boundaries through time.

Appears in 2 contracts

Sources: Addendum, Addendum