Common use of Additional Works Clause in Contracts

Additional Works. 11.1. Additional civil, structural or electrical works which are so required/desired to be undertaken by the Procurer for the Project and which are not covered in the scope of work, shall be done by the SPD after obtaining concurrence of the Procurer on its design, drawing and estimate cost of such additional works shall be computed on the basis of SOR of Government agencies including PWD for Civil and DISCOM for Electrical. Cost of additional works shall be decided mutually between SPD and Procurer but in any case it should not exceed the SOR rates. A copy of actual costand the SOR rates assessed for additional work shall be submitted to UPNEDA for approval. Additional works may include but not limited to; 11.2. Laying of additional length of cable and accessories if the complete space/rooftop provided is more than 500 meters away from the DISCOM metering point. 11.3. Requirement of additional/specific design of structure, as desired by Procurer in deviation with the design provided by the SPD, to accommodate solar panels on rooftop, ground or on any existing structure/ construction/body. 11.4. Construction of approach to the rooftop/place of installation. 11.5. Unless otherwise agreed between the Parties, the SPD shall not do (a) chipping of rooftop; or (b) disturb water proofing of roof (c) carry out any other modification of the Premises without the written consent of the Procurer. One-time cost for strengtheningof Premise to the extent required for setting up Solar PV Project during construction shall be borne by Procurer. In case of any ambiguity, SPD and Procurer shall involve Nodal Agency to get the clarity on the roof strengthening works. Cost of repair or maintenance of Premise to the extent required for the Solar PV Project, during the O&M of Project, shall be the responsibility of SPD, other than cost required for water proofing. The cost for water proofing will be the responsibility of SPD for a period of first three (3) Operational Years. 11.6. In case of any ambiguity over any specific works, SPD and Procurer shall involve Nodal Agency to get the clarity on the additional works.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Additional Works. 11.18.1. Additional civil, structural or electrical works which are so required/desired to be undertaken by the Procurer for the Project and which are not covered in the scope of work, shall be done by the SPD Power Producer after obtaining concurrence of the Procurer on its design, drawing and estimate cost of such additional works shall be computed on the basis of SOR of Government agencies including PWD for APDCL (Civil and DISCOM for \ Mechanical \ Electrical). Cost of additional works shall be decided mutually between SPD Power Producer and Procurer but in any case case, it should not exceed the SOR rates or the actual rates, whichever is lower. A copy of actual costand cost and the SOR rates assessed for additional work shall be submitted to UPNEDA APDCL for approval. Additional works may include but not limited to; 11.28.2. Laying of additional length of cable and accessories if the complete space/rooftop provided is more than 500 meters away from the utility/DISCOM metering point. 11.38.3. Requirement of additional/specific design of structure, as desired by Procurer in deviation with the design provided by the SPDPower Producer, to accommodate solar panels on rooftop, ground or on any existing structure/ construction/body. 11.48.4. Construction of approach to the rooftop/place of installation. 11.58.5. Unless otherwise agreed between the Parties, the SPD Power Producer shall not do (a) chipping of rooftop; or (b) disturb water proofing of roof (c) carry out any other modification of the Premises without the written consent of the Procurer. One-time cost for strengtheningof strengthening of Premise to the extent required for setting up Solar PV Project during construction shall be borne by ProcurerPower Producer. In case Any delay due to strengthening of any ambiguity, SPD and Premise shall not be considered to extend the SCOD unless it is approved by Procurer shall involve Nodal Agency to get the clarity on the roof strengthening worksin written. Cost of repair or maintenance of Premise to the extent required for the Solar PV Project, during the O&M Comprehensive O &M of Project, shall be the responsibility of SPDPower Producer, other than cost required for water proofing. The cost for water proofing will be the responsibility of SPD Power Producer for a period of first three (3) Operational Years. 11.68.6. In case of any ambiguity over any specific works, SPD Power Producer and Procurer shall involve Nodal Agency APDCL to get the clarity on the additional works.

Appears in 1 contract

Sources: Power Purchase Agreement (Ppa)

Additional Works. 11.110.1. Additional civil, structural or electrical works which are so required/desired to be undertaken by the Procurer for the Project and which are not covered in the scope of work, shall be done by the SPD Power Producer after obtaining concurrence of the Procurer on its design, drawing and estimate cost of such additional works shall be computed on the basis of SOR of Government agencies including PWD for Civil (Civil) and of DISCOM for (Electrical). Cost of additional works shall be decided mutually between SPD Power Producer and Procurer but in any case case, it should not exceed the SOR rates or the actual rates, whichever is lower. A copy of actual costand cost and the SOR rates assessed for additional work shall be submitted to UPNEDA RRECL for approval. Additional works may include but not limited to; 11.210.2. Laying of additional length of cable and accessories if the complete space/rooftop provided is more than 500 meters mtrs away from the utility/DISCOM metering point. 11.310.3. Requirement of additional/specific design of structure, as desired by Procurer in deviation with the design provided by the SPDPower Producer, to accommodate solar panels on rooftop, ground or on any existing structure/ construction/body. 11.410.4. Construction of approach to the rooftop/place of installation. 11.510.5. Unless otherwise agreed between the Parties, the SPD Power Producer shall not do (a) chipping of rooftop; or (b) disturb water proofing of roof (c) carry out any other modification of the Premises without the written consent of the Procurer. One-One time cost for strengtheningof strengthening of Premise to the extent required for setting up Solar PV Project during construction shall be borne by ProcurerPower Producer. In case Any delay due to strengthening of any ambiguity, SPD and Premise shall not be considered to extend the SCOD unless it is approved by Procurer shall involve Nodal Agency to get the clarity on the roof strengthening worksin written. Cost of repair or maintenance of Premise to the extent required for the Solar PV Project, during the O&M Comprehensive O &M of Project, shall be the responsibility of SPDPower Producer, other than cost required for water proofing. The cost for water proofing will be the responsibility of SPD Power Producer for a period of first three (3) Operational Years. 11.610.6. In case of any ambiguity over any specific works, SPD Power Producer and Procurer shall involve Nodal Agency to get the clarity on the additional works.

Appears in 1 contract