Common use of Adjacent Space Collocation Clause in Contracts

Adjacent Space Collocation. Where Physical Collocation space within SBC-13STATE Eligible Structure is Legitimately Exhausted, as that term is defined in Section 2 of this Appendix, SBC-13STATE will permit Collocator to physically collocate on SBC- 13STATE’s property in adjacent controlled environmental vaults or similar structures that SBC-13STATE uses to house telecommunication equipment, to the extent technically feasible. SBC-13STATE and telecommunications carrier will mutually agree on the location of the designated space on SBC-13STATE premises where the adjacent structure will be placed. SBC-13STATE will not unreasonably withhold agreement as to the site desired by Collocator. Safety and maintenance requirements, zoning and other state and local regulations are all reasonable grounds to withhold agreement as to the site desired by the Collocator. SBC-13STATE will offer the following increments of power to the Adjacent On-site structure: SBC-13STATE will provide a standard offering of 100 AMPS of AC power to the adjacent structure when Central Office Switchboard AC capacity exists. SBC-13STATE will provide DC power within two cable options that allow increments of 2-100 Amp Power Feeds, 2-200 Amp Power Feeds, 2-300 Amp Power Feeds, and 2-400 Amp Power Feeds to the adjacent structure from the Central Office Power source. At its option, the Collocator may choose to provide its own AC and DC power to the adjacent structure. SBC-13STATE will provide Physical Collocation services to such adjacent structures, subject to the same requirements as other collocation arrangements in this Appendix. SBC-13STATE shall permit Collocator to place its own equipment, including, but not limited to, copper cables, coaxial cables, fiber cables and telecommunications equipment, in adjacent facilities constructed by either SBC-13STATE or the Collocator. Collocator shall be responsible for securing all required licenses and permits, the required site preparations and shall further retain responsibility for securing and/or constructing the adjacent structure and any building and site maintenance associated with the placement of such adjacent structure. 6.1.1.5.1 Where Physical Collocation space within SBC-13STATE Eligible Structure is Legitimately Exhausted, and Collocator’s Adjacent On-site space is not within 50 ft. of the Eligible Structure’s outside perimeter wall, the Collocator has the option and SBC-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible.

Appears in 3 contracts

Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Adjacent Space Collocation. Where Physical Collocation space within SBC-13STATE AT&T-13STATE Eligible Structure is Legitimately Exhausted, as that term is defined in Section 2 of this Appendix, SBC-13STATE AT&T-13STATE will permit Collocator to physically collocate on SBC- AT&T- 13STATE’s property in adjacent controlled environmental vaults or similar structures that SBC-13STATE AT&T-13STATE uses to house telecommunication equipment, to the extent technically feasible. SBC-13STATE AT&T-13STATE and telecommunications carrier will mutually agree on the location of the designated space on SBC-13STATE AT&T-13STATE premises where the adjacent structure will be placed. SBC-13STATE AT&T-13STATE will not unreasonably withhold agreement as to the site desired by Collocator. Safety and maintenance requirements, zoning and other state and local regulations are all reasonable grounds to withhold agreement as to the site desired by the Collocator. SBC-13STATE AT&T-13STATE will offer the following increments of power to the Adjacent On-site structure: SBC-13STATE AT&T-13STATE will provide a standard offering of 100 AMPS of AC power to the adjacent structure when Central Office Switchboard AC capacity exists. SBC-13STATE AT&T-13STATE will provide DC power within two cable options that allow increments of 2-100 Amp Power Feeds, 2-200 Amp Power Feeds, 2-300 Amp Power Feeds, and 2-400 Amp Power Feeds to the adjacent structure from the Central Office Power source. At its option, the Collocator may choose to provide its own AC and DC power to the adjacent structure. SBC-13STATE AT&T-13STATE will provide Physical Collocation services to such adjacent structures, subject to the same requirements as other collocation arrangements in this Appendix. SBC-13STATE AT&T-13STATE shall permit Collocator to place its own equipment, including, but not limited to, copper cables, coaxial cables, fiber cables and telecommunications equipment, in adjacent facilities constructed by either SBC-13STATE AT&T-13STATE or the Collocator. Collocator shall be responsible for securing all required licenses and permits, the required site preparations and shall further retain responsibility for securing and/or constructing the adjacent structure and any building and site maintenance associated with the placement of such adjacent structure. 6.1.1.5.1 Where Physical Collocation space within SBC-13STATE AT&T-13STATE Eligible Structure is Legitimately Exhausted, and Collocator’s Adjacent On-site space is not within 50 ft. of the Eligible Structure’s outside perimeter wall, the Collocator has the option and SBC-13STATE AT&T-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible. 6.1.1.5.2 The Adjacent Off-site Arrangement is available if the Collocator’s site is located on a property that is contiguous to or within one standard city block of the AT&T-13STATE Central Office or Eligible Structure. Such arrangement shall be used for interconnection and access to Lawful UNEs. When the Collocator elects to utilize an Adjacent Off-site Arrangement, the Collocator shall provide both the AC and DC power required to operate such facility. The Collocator may provide its own facilities to AT&T-13STATE’s premises or to a mutually agreeable meet point from its Adjacent Off-site location for interconnection purposes. The Collocator may subscribe to facilities available in the UNE rate schedule of the Collocator’s Agreement. 6.1.1.5.3 At the time the Collocator requests this arrangement, the Collocator must provide information as to the location of the Adjacent Off-site facility, the proposed method of interconnection, and the time frame needed to complete provisioning of the arrangement. AT&T-13STATE shall provide a response to Collocator within ten (10) days of receipt of the application, including a price quote, provisioning interval, and confirmation of the manner in which the Adjacent Off-site Facility will be interconnected with AT&T-13STATE’s facilities. AT&T-13STATE shall make best efforts to meet the time intervals requested by Collocator and, if it cannot meet the Collocator’s proposed deadline, shall provide detailed reasons, as well as proposed provisioning intervals. 6.1.1.5.4 In the event that interior space in an Eligible Structure becomes available, AT&T-13STATE will provide the option to the Collocator to relocate its equipment from an Adjacent On-site or an Adjacent Off-site Facility into the interior space. In the event the Collocator chooses to relocate its equipment into the interior space, appropriate charges applicable for collocation within the Eligible Structure will apply.

Appears in 1 contract

Sources: Interconnection Agreement