Air Emission Guidelines and Monitoring Clause Samples

Air Emission Guidelines and Monitoring. Contractor is authorized to discharge air emissions. Such discharges will be limited and monitored as follows: A. Any building, structure, facility, or installation that emits or may emit nitrogen oxides (NOx), sulphur dioxides (SOx), carbon monoxide (CO), volatile organic compounds (VOCs), or particulate (PT) in an amount equal to or greater than 227 metric tons per year (MTPY) per individual pollutant (250 short tons per year) shall install the best available control technology on all equipment creating the emissions suitable for the equipment creating the emissions and its location. If the source is above 227 MTPY, screening modelling will be conducted to determine potential impacts on sensitive receptors. This trigger amount may be less in cases where sensitive receptors are in close proximity to the source. (NOTE: Any individual item of equipment emitting less than 23 MTPY (25 short TPY) or IC engines/turbines below 500 break horsepower would be exempt from this requirement.) Emergency flares on facilities will be designed to operate smokeless and with continuous pilots or equivalent ignition systems. B. Any storage vessel with a capacity greater than 1,590 cubic meters (10,000 Barrels) used for Petroleum or condensate storage shall install necessary control technology to minimise emissions. C. IC engines/turbines larger than 500 HP should be monitored on an annual basis to assure that the NOx and CO emissions are at the specified levels. Portable analyzers for monitoring the NOx and CO should be calibrated before each test using a known reference gas sample. All new facilities will comply with the above standards. Existing facilities within the Contract Area being operated by Contractor will be brought into compliance with these standards according to a schedule to be negotiated, taking into account the condition, function and economic viability of the facilities.

Related to Air Emission Guidelines and Monitoring

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Listing and Maintenance Requirements Compliance The Company has not in the two years preceding the date hereof received written notice from any stock exchange, market or trading facility on which the Common Stock is or has been listed or quoted to the effect that the Company is not in compliance with the listing, maintenance or other requirements of such exchange, market, trading or quotation facility. The Company has no reason to believe that it does not now or will not in the future meet any such requirements.

  • General Guidelines Conduct yourself in a responsible manner at all times in the laboratory.