Common use of Amendment to Connection Point data Clause in Contracts

Amendment to Connection Point data. Unless the Parties otherwise agree, where information is referred to in Part 1 of Schedule 3, Horizon Power Pilbara Network must, as soon as reasonably practicable after the Commencement Date, record as much of that information with respect to each Connection Point as it is reasonably able to in an electronic database. For the avoidance of doubt, the electronic database referred to in this clause 4.7(a) will form part of the Connection Point Database. Subject to clauses 4.7(h) and 4.7(i), Horizon Power Pilbara Network must, as soon as reasonably practicable, update the information contained in the Connection Point Database following any variation made under this clause 4. Where, under this Contract, the Connection Point Database consists of Part 1 of Schedule 3 (either partially or wholly), the User acknowledges and agrees that Horizon Power Pilbara Network may, following any: (1) variation made under this clause 4; or (2) requirement under this clause 4 to update the Connection Point Database, update the information contained in Part 1 of Schedule 3 by written notice to the User. Upon request by the User for information referred to in the Connection Point Database, Horizon Power Pilbara Network will, as soon as reasonably practicable, provide to the User the most up-to-date version of that information. The Parties acknowledge that if the User is a Metering Code Participant, for each Connection Point Horizon Power Pilbara Network must record and update as much of the information required under Part 1 of Schedule 3 as it is reasonably able to in the Metering Database in accordance with the provisions of the Metering Code and, to the extent that a timeframe is not specified in the Metering Code or the Model Service Level Agreement in force between the User and Horizon Power Pilbara Network, Horizon Power Pilbara Network must do so as soon as is reasonably practicable. Nothing in this Contract restricts or prohibits Horizon Power Pilbara Network from maintaining and updating the Metering Database in accordance with the Metering Code. Horizon Power Pilbara Network will provide the User with access to the information in the Metering Database relating to each Connection Point in accordance with the Communication Rules and the Metering Code. Subject to clause 4.7(i), where Horizon Power Pilbara Network causes a Permanent Reconfiguration of the Network which results in the information contained in the Connection Point Database having to be updated, Horizon Power Pilbara Network: (1) is not required to update the information contained in the Connection Point Database before the next 1 July following the Permanent Reconfiguration of the Network; and (2) must update the information contained in the Connection Point Database before the date that is 21 days after the date referred to in clause 4.7(h)(1). Where a Permanent Reconfiguration of the Network occurs as a result of, or arising from, a notice or Application by the User under clauses 4.4, 4.5 or 4.6, or which results in the information contained in the Connection Point Database having to be updated: (1) clause 4.7(h) does not apply; and

Appears in 2 contracts

Sources: Access Contract, Access Contract