Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.
During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).
Cost of Construction 1. During the Schematic Design, Design Development, and Construction Document Phases, the ARCHITECT’s estimates of Construction Cost shall be reconciled against the Budget approved by the DISTRICT pursuant to Article IV, Section 2. 2. The PROJECT’s “Construction Cost,” as used in this AGREEMENT, means the total cost to the DISTRICT of all work designed or specified by the ARCHITECT, which includes the total award from the initial construction Contract(s) plus the work covered by approved change orders and/or any alternates approved by the DISTRICT. The Construction Cost shall not include any costs that are not specifically referenced in this Article V, Section 2, as approved costs. Costs excluded from the Construction Cost include, but are not limited to, payments to the ARCHITECT or other DISTRICT consultants, costs of inspections, surveys, tests, and landscaping not included in PROJECT. 3. If the PROJECT is using the multiple-prime delivery method of construction, the Construction Manager’s fees and/or general conditions will only be included in the total Construction Cost used to calculate the ARCHITECT’s fee only if agreed upon in writing by the DISTRICT. Absent any written agreement, the Construction Manager’s fees or general conditions shall not be included in the total Construction Cost used to calculate the ARCHITECT’s fee. 4. When labor or material is furnished by the DISTRICT below its market cost, the Construction Cost shall be based upon current market cost of labor and new material. 5. The Construction Cost shall be the acceptable estimate of Construction Costs to the DISTRICT as submitted by the ARCHITECT until such time as bids have been received, whereupon it shall be the bid amount of the lowest responsible responsive bidder. 6. Any Budget or fixed limit of Construction Cost shall be adjusted if the bidding has not commenced within ninety (90) days after the ARCHITECT submits the Construction Documents to the DISTRICT to reflect changes in the general level of prices in the construction industry between the date of submission of the Construction Documents to the DISTRICT and the date on which bids are sought for the PROJECT. 7. If the lowest bid received exceeds the Budget: a. The DISTRICT may give written approval of an increase of such fixed limit and proceed with the construction of the PROJECT; b. The DISTRICT may authorize rebidding of the PROJECT within a reasonable time; c. If the PROJECT is abandoned, the DISTRICT may terminate this AGREEMENT in accordance with Article VIII, Section 2; d. The DISTRICT may request the ARCHITECT prepare, at no additional cost, deductive change packages that will bring the PROJECT within the Budget; or e. The DISTRICT may request the ARCHITECT cooperate in revising the PROJECT scope and quality as required to reduce the Construction Cost. 8. If the DISTRICT chooses to proceed under Article V, Section 7(e), the ARCHITECT, without additional charge, agrees to redesign the PROJECT until the PROJECT is brought within the Budget set forth in this AGREEMENT. Redesign does not mean phasing or removal of parts of the PROJECT unless agreed to in writing by the DISTRICT. Redesign means the redesign of the PROJECT, with all its component parts, to meet the Budget set forth in this AGREEMENT.
DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.
Language Construction The language of this Agreement shall be construed in accordance with its fair meaning and not for or against any party. The parties acknowledge that each party and its counsel have reviewed and had the opportunity to participate in the drafting of this Agreement and, accordingly, that the rule of construction that would resolve ambiguities in favor of non-drafting parties shall not apply to the interpretation of this Agreement.