Common use of Approval by the Engineer Clause in Contracts

Approval by the Engineer. 18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 The Contractor shall be responsible for design of Temporary Works. 18.3 The Engineer's approval shall not alter the Contractor's responsibility for design of the Temporary Works. 18.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 58 contracts

Sources: Construction Contract, Construction Contract, Construction Contract

Approval by the Engineer. 18.1 18.1. The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 18.2. The Contractor shall be responsible for of design of Temporary Works. 18.3 18.3. The Engineer's ’s approval shall not alter the Contractor's ’s responsibility for design of the Temporary Works. 18.4 18.4. The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 18.5. All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 3 contracts

Sources: Bidding Document, Construction Contract, Bid Document

Approval by the Engineer. 18.1 18.1. The Contractor shall submit Specifications Specification and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 18.2. The Contractor shall be responsible for design of Temporary Works. 18.3 18.3. The Engineer's Engineer‟s approval shall not alter the Contractor's Contractor‟s responsibility for design of the Temporary Works. 18.4 18.4. The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 18.5. All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 2 contracts

Sources: Bid Document, Bid Document

Approval by the Engineer. 18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 The Contractor shall be responsible for design of Temporary Works.Temporary 18.3 The Engineer's approval shall not alter the Contractor's responsibility for design of the Temporary Works. 18.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 1 contract

Sources: Construction Contract

Approval by the Engineer. 18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 The Contractor shall be responsible for design of Temporary Works. 18.3 The Engineer's ’s approval shall not alter the Contractor's ’s responsibility for design of the Temporary Works. 18.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 All Drawings drawings prepared by the Contractor for the execution of the temporary or permanent Works, works are subject to prior approval by the Engineer before their use. In case of dispute, if any, decision of the Chief Engineer will be final.

Appears in 1 contract

Sources: Construction Contract

Approval by the Engineer. 18.1 18.1. The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 18.2. The Contractor shall be responsible for design of Temporary Works. 18.3 18.3. The Engineer's approval shall not alter the Contractor's responsibility for design of the Temporary Works. 18.4 18.4. The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 18.5. All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 1 contract

Sources: Procurement Agreement

Approval by the Engineer. 18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 The Contractor shall be responsible for design of Temporary Workstemporary works. 18.3 The Engineer's ’s approval shall not alter the Contractor's ’s responsibility for design of the Temporary Works. 18.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 1 contract

Sources: Construction Contract

Approval by the Engineer. 18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 The Contractor shall be responsible for design of Temporary Works. 18.3 The Engineer's approval shall not alter the Contractor's responsibility for design of the Temporary Works. 18.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works where required. 18.5 All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use. 18.6 Material samples like flooring , hardware , sanitary and other fixtures and flooring patterns as per drawings shall got approved by Architect

Appears in 1 contract

Sources: Construction Agreement

Approval by the Engineer. 18.1 17.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the Engineer, who is to approve them if they comply with the Specifications and Drawings. 18.2 17.2 The Contractor shall be responsible for design and safety of Temporary Works. 18.3 17.3 The Engineer's approval shall not alter the Contractor's responsibility for design and safety of the Temporary Works. 18.4 17.4 The Contractor shall obtain approval of third parties to the design of the Temporary Works Works, where required. 18.5 17.5 All Drawings prepared by the Contractor for the execution of the temporary or permanent Works, are subject to prior approval by the Engineer before their use.

Appears in 1 contract

Sources: E Tender for Biannual Works Contract