APPROVAL DRAWINGS Sample Clauses

The Approval Drawings clause establishes the requirement for certain design or technical drawings to be submitted for review and formal approval before work proceeds. Typically, this clause applies to construction or engineering projects, where contractors must provide detailed plans or schematics to the client or project manager for examination. By mandating this review process, the clause ensures that all parties agree on the specifications and standards before implementation, thereby reducing the risk of errors, rework, or disputes later in the project.
POPULAR SAMPLE Copied 4 times
APPROVAL DRAWINGS. Approval drawings, if provided to Buyer by Seller and either signed by a representative of Buyer with apparent authority to do so or not objected to by Buyer in writing within a reasonable time or, if required, the time required by Seller, shall constitute exclusive proof regarding Buyer’s verification and acceptance of the dimensions and other information relating to the goods described therein, and Seller shall be entitled to rely on such approval drawings to provide the Goods and Services referenced therein. Buyer hereby assumes any and all responsibility for any inaccurate or incomplete information contained therein. TO THE EXTENT THAT BUYER PROVIDES THE DESIGN AND/OR SPECIFICATIONS FOR ANY GOODS OR SERVICES TO BE PROVIDED OR PERFORMED BY SELLER, BUYER SHALL INDEMNIFY, DEFEND, AND HOLD HARMLESS SELLER AGAINST ALL CLAIMS, SUITS, AND CAUSES OF ACTION AND FROM ALL COSTS, EXPENSES, DAMAGES AND LIABILITIES (INCLUDING BUT NOT LIMITED TO ATTORNEYS’ AND CONSULTANTS’ FEES) FROM IMPROPER OR DEFECTIVE DESIGN AND FOR ACTUAL OR ALLEGED INFRINGEMENT OF ANY UNITED STATES OR FOREIGN PATENT, COPYRIGHT, TRADEMARK, INTELLECTUAL PROPERTY RIGHTS, OR PROPRIETARY RIGHTS OF THIRD PARTIES BY REASON OF THE USE, SALE, MANUFACTURE, OR DESIGN OF SUCH GOODS AND/OR SERVICES.
APPROVAL DRAWINGS. (See Project Schedule Above for Lead Times)
APPROVAL DRAWINGS. Prepare approval drawings of fire protection systems indicating pipe sizes, pipe locations, fittings, shutoff and equipment. Submit to Agency having jurisdiction for approval. Submit one approved copy, bearing stamp and/or signature of Agency having jurisdiction, before proceeding with installation.
APPROVAL DRAWINGS. The following Approval drawings shall be submitted via e-mail in AutoCAD version 2018 or earlier format: 10.1.1 Outline - showing location of all external parts and accessories
APPROVAL DRAWINGS. All approval drawings submitted for review shall be in English. All final documentation shall be in English and in AutoCAD (.dwg) format. Release 2010 format is preferred but release 2004 thru 2010 format is acceptable. Older formats are not acceptable. Cut sheets must also be in the above referenced AutoCAD format. Adobe Portable Document Format (PDF), Tagged Image Format (TIF), Bitmap (BMP), Joint Photographic Experts Group (JPEG) or any other image formats are not acceptable.

Related to APPROVAL DRAWINGS

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.