Approval of Construction. (a) The Gas Company shall not undertake any excavation, opening or work which will disturb or interfere with the surface of the travelled portion of any highway unless a permit therefor has first been obtained from the Engineer/Road Superintendent and all work done by the Gas Company shall be to his satisfaction. (b) Prior to the commencement of work on the gas system, or any extensions or changes to it (except service laterals which do not interfere with municipal works in the highway), the Gas Company shall file with the Engineer/Road Superintendent a Plan, satisfactory to the Engineer/Road Superintendent, drawn to scale and of sufficient detail considering the complexity of the specific locations involved, showing the highways in which it proposes to lay its gas system and the particular parts thereof it proposes to occupy. (c) The Plan filed by the Gas Company shall include geodetic information for a particular location: (i) where circumstances are complex, in order to facilitate known projects, including projects which are reasonably anticipated by the Engineer/Road Superintendent, or (ii) when requested, where the Corporation has geodetic information for its own services and all others at the same location. (d) The Engineer/Road Superintendent may require sections of the gas system to be laid at greater depth than required by the latest CSA standard for gas pipeline systems to facilitate known projects or to correct known highway deficiencies. (e) Prior to the commencement of work on the gas system, the Engineer/Road Superintendent must approve the location of the work as shown on the Plan filed by the Gas Company, the timing of the work and any terms and conditions relating to the installation of the work. (f) In addition to the requirements of this Agreement, if the Gas Company proposes to affix any part of the gas system to a bridge, viaduct or other structure, if the Engineer/Road Superintendent approves this proposal, he may require the Gas Company to comply with special conditions or to enter into a separate agreement as a condition of the approval of this part of the construction of the gas system. (g) Where the gas system may affect a municipal drain, the Gas Company shall also file a copy of the Plan with the Corporation's Drainage Superintendent for purposes of the Drainage Act, or such other person designated by the Corporation as responsible for the drain. (h) The Gas Company shall not deviate from the approved location for any part of the gas system unless the prior approval of the Engineer/Road Superintendent to do so is received. (i) The Engineer/Road Superintendent's approval, where required throughout this Paragraph, shall not be unreasonably withheld. (j) The approval of the Engineer/Road Superintendent is not a representation or warranty as to the state of repair of the highway or the suitability of the highway for the gas system.
Appears in 14 contracts
Sources: Franchise Agreement, Franchise Agreement, Franchise Agreement
Approval of Construction. (a) The Gas Company shall not undertake any excavation, opening or work which will disturb or interfere with the surface of the travelled portion of any highway unless a permit therefor therefore has first been obtained from the Engineer/Road Superintendent and all work done by the Gas Company shall be to his satisfaction.
(b) Prior to the commencement of work on the gas system, or any extensions or changes to it (except service laterals which do not interfere with municipal works in the highway), the Gas Company shall file with the Engineer/Road Superintendent a Plan, satisfactory to the Engineer/Road Superintendent, drawn to scale and of sufficient detail considering the complexity of the specific locations involved, showing the highways in which it proposes to lay its gas system and the particular parts thereof it proposes to occupy.
(c) The Plan filed by the Gas Company shall include geodetic information for a particular location:
(i) where circumstances are complex, in order to facilitate known projects, including projects which are reasonably anticipated by the Engineer/Road Superintendent, or
(ii) when requested, where the Corporation has geodetic information for its own services and all others at the same location.
(d) The Engineer/Road Superintendent may require sections of the gas system to be laid at greater depth than required by the latest CSA standard for gas pipeline systems to facilitate known projects or to correct known highway deficiencies.
(e) Prior to the commencement of work on the gas system, the Engineer/Road Superintendent must approve the location of the work as shown on the Plan filed by the Gas Company, the timing of the work and any terms and conditions relating to the installation of the work.
(f) In addition to the requirements of this Agreement, if the Gas Company proposes to affix any part of the gas system to a bridge, viaduct or other structure, if the Engineer/Road Superintendent approves this proposal, he may require the Gas Company to comply with special conditions or to enter into a separate agreement as a condition of the approval of this part of the construction of the gas system.
(g) Where the gas system may affect a municipal drain, the Gas Company shall also file a copy of the Plan with the Corporation's Drainage Superintendent for purposes of the Drainage Act, or such other person designated by the Corporation as responsible for the drain.
(h) The Gas Company shall not deviate from the approved location for any part of the gas system unless the prior approval of the Engineer/Road Superintendent to do so is received.
(i) The Engineer/Road Superintendent's approval, where required throughout this Paragraph, shall not be unreasonably withheld.
(j) The approval of the Engineer/Road Superintendent is not a representation or warranty as to the state of repair of the highway or the suitability of the highway for the gas system.
Appears in 4 contracts
Sources: Franchise Agreement, Franchise Agreement, Franchise Agreement
Approval of Construction. (a) a. The Gas Company shall not undertake any excavation, opening or work which will disturb or interfere with the surface of the travelled portion of any highway unless a permit therefor has first been obtained from the Engineer/Road Superintendent and all work done by the Gas Company shall be to his satisfaction.
(b) b. Prior to the commencement of work on the gas system, or any extensions or changes to it (except service laterals which do not interfere with municipal works in the highway), the Gas Company shall file with the Engineer/Road Superintendent a Plan, satisfactory to the Engineer/Road Superintendent, drawn to scale and of sufficient detail considering the complexity of the specific locations involved, showing the highways in which it proposes to lay its gas system and the particular parts thereof it proposes to occupy.
(c) c. The Plan filed by the Gas Company shall include geodetic information for a particular location:
(i) i. where circumstances are complex, in order to facilitate known projects, including projects which are reasonably anticipated by the Engineer/Road Superintendent, or
(ii) . when requested, where the Corporation has geodetic information for its own services and all others at the same location.
(d) d. The Engineer/Road Superintendent may require sections of the gas system to be laid at greater depth than required by the latest CSA standard for gas pipeline systems to facilitate known projects or to correct known highway deficiencies.
(e) e. Prior to the commencement of work on the gas system, the Engineer/Road Superintendent must approve the location of the work as shown on the Plan filed by the Gas Company, the timing of the work and any terms and conditions relating to the installation of the work.
(f) f. In addition to the requirements of this Agreement, if the Gas Company proposes to affix any part of the gas system to a bridge, viaduct or other structure, if the Engineer/Road Superintendent approves this proposal, he may require the Gas Company to comply with special conditions or to enter into a separate agreement as a condition of the approval of this part of the construction of the gas system.
(g) g. Where the gas system may affect a municipal drain, the Gas Company shall also file a copy of the Plan with the Corporation's Drainage Superintendent for purposes of the Drainage Act, or such other person designated by the Corporation as responsible for the drain.
(h) h. The Gas Company shall not deviate from the approved location for any part of the gas system unless the prior approval of the Engineer/Road Superintendent to do so is received.
(i) i. The Engineer/Road Superintendent's approval, where required throughout this Paragraph, shall not be unreasonably withheld.
(j) j. The approval of the Engineer/Road Superintendent is not a representation or warranty as to the state of repair of the highway or the suitability of the highway for the gas system.