Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Screening The Health Plan must work with contracted providers to conduct interperiodic EPSDT screens on RIte Care and all ACA Adult Expansion Population members under age 21 (i.e. 19 and 20-year old under this Agreement) to identify health and developmental problems in conformance with ATTACHMENT ED to this Agreement. Additional screens should be provided as Medically Necessary. At a minimum, these screens must include: • A comprehensive health and developmental history, including health education, nutrition assessment, immunization history, and developmental assessment • Immunizations according to the Rhode Island EPSDT Periodicity Schedule • An unclothed physical examination • Laboratory tests including lead, TB, and newborn screenings as medically indicated • Vision testing • Hearing testing • Dental screening oral examination by PCP as part of a comprehensive examination required before age one (1) • All other medically indicated screening services • And provide EOHHS with a list of established CPT/HCPC codes used to identify all billable services included in the EPSDT schedule.
Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.
Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.