Area Codes. C.1.1.9.1 The Technical Requirements, and especially the process functional requirements in Appendix 18A – Process Functional Requirements, have used the Area Codes in accordance with the Document Numbering Standard found in Appendix 18D – City Standards. These Area Codes should be used as a guide. However, if Design Builder desires to modify and update the Area Codes and the processes contained within the areas Design Builder shall submit the proposed changes to the City for review in accordance with the RFS procedure. Proposed changes to Area Codes, if applicable, shall be submitted to the City for review prior to submission of the 30% Design Submittal. The Area Codes anticipated for this Project are: (a) Area H: Headworks Facility; (b) Area P: Primary Clarification Facility; (c) Area C: Centrate Treatment Facility; (d) Area G: Standby Generation Facility and Existing Grit Removal Facility; (e) Area Y: Yard; (f) Area E: Electrical Building and Substation; and (g) Area M: Main Building.
Appears in 2 contracts
Sources: Design Build Agreement, Design Build Agreement