Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).
Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B07CYPCHM3, with the description, "60-40 Tin Lead Rosin Core Solder Wire with 2% Flux for Electrical Soldering and DIY, 2 Sizes, Include 0.6mm & 0.8mm, 2pcs (0.6mm&0.8mm Solder Wire)," which was offered for sale by the Settling Entity on ▇▇▇▇▇▇.▇▇▇, hereinafter the “Product” or “Products.”
Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}
Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 9314A Single Lane / Level 1 NFSR 9314 0.00 END 0.20
Overtime Description For Paid Holidays: Holiday pay for all holidays shall be prorated based two hours per day for each day worked in the holiday week, not to exceed 8 hours of holiday pay. For Thanksgiving week, the prorated share shall be 5 1/3 hours of holiday pay for each day worked in Thanksgiving week. Overtime Time and one half the regular rate after an 8 hour day. Time and one half the regular rate for Saturday. Double time the regular rate for Sunday.