Asset Installation. 3.1.1. Introduction This process covers Assets including new Meters being installed on: • An existing supply where a Meter had been removed some time previously; or • A supply which has never had a Meter before. This may be on the day the supply was commissioned or sometime after. A Meter which is being disconnected and connected as part of the same job is classed as an Asset exchange and is not covered by this process. Although a Meter could be at a premise before the supply, it cannot be connected to the supply until the supply is laid. Therefore, a Meter connection will always require a supply to exist. 3.1.2. Process Map Process maps included in Annex E of the Online RGMA Data Flow Catalogue.
Appears in 2 contracts
Sources: Supply Point Administration Agreement, Supply Point Administration Agreement