Automatic Generation Control. Automatic generation control shall be demonstrated for the entire facility and individual gas turbines from 50% base load to maximum output. Two separate tests (each in Phase I and again in Phase II) will be performed; the first, with the gas turbine being tested, and second with all of the installed gas turbines for that Phase in service. In each test the automatic generation control equipment will be used to balance load on the gas turbine(s) ramping the unit(s) from 50% to base load. Plant response characteristics shall meet and can be used to satisfy the AGC requirements referred to in item 2.2.2.5 above.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Agreement (Tenaska Georgia Partners Lp), Engineering, Procurement and Construction Agreement (Tenaska Georgia Partners Lp)