Backhaul Transport Sample Clauses

Backhaul Transport. CLEC acknowledges that it is responsible for obtaining the facilities or services for the backhaul of data to CLEC’s operational data centers.

Related to Backhaul Transport

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Transport The Parents consent to the Pupil travelling by any form of public transport and / or in a motor vehicle driven by a responsible adult who is duly licensed and insured to drive a vehicle of that type.

  • Shared Transport The Shared Transport Network Element (“Shared Transport”) provides the collective interoffice transmission facilities shared by various Carriers (including Qwest) between end-office switches and between end-office switches and local tandem switches within the Local Calling Area. Shared Transport uses the existing routing tables resident in Qwest switches to carry the End User Customer’s originating and terminating local/extended area service interoffice Local traffic on the Qwest interoffice message trunk network. CLEC traffic will be carried on the same transmission facilities between end- office switches, between end-office switches and tandem switches and between tandem switches on the same network facilities that Qwest uses for its own traffic. Shared Transport does not include use of tandem switches or transport between tandem switches and end-office switches for Local Calls that originate from end users served by non- Qwest Telecommunications Carriers (“Carrier(s)”) which terminate to QLSP End Users.

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.