Backing Up Work Clause Samples

Backing Up Work. Backing up files is highly recommended as it is the student’s responsibility to ensure that work is not lost due to mechanical failure or accidental deletion. It is recommended that students back up their work by emailing themselves documents, saving files on flash drives, or using apps such as Dropbox or the student’s Google drive. Google Drive is the preferred method of saving at Mother ▇▇▇▇▇▇▇. iPad malfunctions are not an acceptable excuse for not submitting work and/or being unprepared for class.
Backing Up Work. Backing up files is highly recommended as it is the student’s responsibility to ensure that work is not lost due to mechanical failure or accidental deletion. It is recommended that students save their work to Google Drive.

Related to Backing Up Work

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • STOP WORK (a) SELLER shall stop Work for up to ninety (90) days in accordance with any written notice received from LOCKHEED ▇▇▇▇▇▇, or for such longer period of time as the parties may agree and shall take all reasonable steps to minimize the incurrence of costs allocable to the Work during the period of Work stoppage. (b) Within such period, LOCKHEED ▇▇▇▇▇▇ shall either terminate in accordance with the provisions of this Contract or continue the Work by written notice to SELLER. In the event of a continuation, an equitable adjustment in accordance with the principles of the "Changes" clause shall be made to the price, delivery schedule, or other provision(s) affected by the Work stoppage, if applicable, provided that the claim for equitable adjustment is made within thirty (30) days after date of notice to continue.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Completion of the Work The Contractor must obtain Material Completion as defined in Section 6.1.2 below prior to any occupancy of the Project.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.