Base Station Clause Samples

Base Station. Location where the radiant system and the eNodeB equipment will be installed, including functionalities that involve hardware and software to optimize the performance of the radio interface that enables to enter the network with IP protocol, allowing it to be an end-to-end "all IP" architecture.
Base Station. Base Station" shall mean a location where Flight Attendants are permanently based.
Base Station a device that receives data stored in the SCRAM CAM Bracelet. Data is typically transmitted and stored in the SCRAM CAM Bracelet to the base station by either a telephone landline or Ethernet connection.
Base Station. Licensee, DTR and Malco each acknowledge that the first on-site server is designed to be the "base station" for multiple applications to be delivered and installed per a roll out schedule as the systems become available and the market warrants.
Base Station. A land station in the land mobile service. (RR)
Base Station a. Computes( ) ( ) b. If Grant Authentication Else c. Blacklist the biosensor d. If Grant Authentication e. Computes = ( )
Base Station. The base station is responsible for transmitting messages between vehicles and the CN. In the offline scenario, the communication between BS and vehicles does not exist.
Base Station. All right, title, and interest in and to the Base Station shall remain in Varitek. Licensee obtains only the limited permission to use the Services as provided in Section 3, conditional in all respects to the restrictions stated in this Agreement

Related to Base Station

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • System Use (a) An electronic site access system may be used on site, subject to the requirements of this statement. (b) The system operates via: (i) a facial recognition device; and (ii) an electronic gate. (c) The system will be installed at the access and egress point/s of the site and will only be utilised to identify presence on site. (d) The purpose for which the electronic site access system will be implemented is to ensure: (i) avoiding unauthorised access to site; (ii) confirmation and co-ordination of effort in emergency situations; and (iii) confirmation that all entrants to site have received a site specific induction; (e) The only personal data collected by the system is a site entrant’s: (i) image; (ii) first & last name; (iii) mobile phone number; (iv) email address; and (v) employer’s name. (the Collected Data) (f) The Collected Data will only be held or used for the purposes specified above, unless otherwise by consent or required by law. (g) The Employer will not use the electronic site access control system to verify who was on a site at a particular time for the purpose of: (i) evaluating whether a variation claim regarding labour costs made by a subcontractor can be substantiated; (ii) taking disciplinary action against an Employee, or assisting a subcontractor to take disciplinary action against its own employees, regarding their start and finish times; or (iii) otherwise generally tracking a worker’s movements whilst on the site.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.