Common use of Battery Storage System Clause in Contracts

Battery Storage System. The Battery Energy Storage System ("▇▇▇▇") operational conditions ("Operational Conditions") shall be as follows: [DRAFTING NOTE – Revise to be specific to RFP and allowing for grid charging.] No more than ____% of the ▇▇▇▇ energy capacity can be charged from the grid prior to the fifth anniversary of the Commercial Operations Date. Thereafter, 100% of the ▇▇▇▇ energy capacity can be charged from the grid. All charging from the grid will be at the direction of Company. [DRAFTING NOTE: 5-YEAR LIMITATION ON GRID CHARGING WILL BE DELETED IF ITC RECAPTURE IS NOT APPLICABLE TO THE ▇▇▇▇.] For Contract Years that are non-leap years, the ▇▇▇▇ shall be discharged no more than ▇▇▇▇ Rating x 365 MWh in each Contract Year. For Contract Years that are leap years, the ▇▇▇▇ shall be discharged no more than ▇▇▇▇ Rating x 366 MWh in each Contract Year. The ▇▇▇▇ will not be required to discharge more energy than available relative to the available state of charge. The ▇▇▇▇ may be called on to provide frequency droop response, frequency regulation response, and frequency regulation (AGC dispatch) under the following conditions: Dispatch to the grid is limited to the interconnection limit minus the generation from the PV system. PSS/E ASPEN PSCAD ATTACHMENT C METHODS AND FORMULAS FOR MEASURING PERFORMANCE STANDARDS

Appears in 2 contracts

Sources: Power Purchase Agreement, Power Purchase Agreement

Battery Storage System. The Battery Energy Storage System ("▇▇▇▇") operational conditions ("Operational Conditions") shall be as follows: [DRAFTING NOTE – Revise to be specific to RFP and allowing for grid charging.] No more than ____% of the ▇▇▇▇ energy capacity can be charged from the grid prior to the fifth anniversary of the Commercial Operations Date. Thereafter, 100% of the ▇▇▇▇ energy capacity can be charged from the grid. All charging from the grid will be at the direction of Company. [DRAFTING NOTE: 5-YEAR LIMITATION ON GRID CHARGING WILL BE DELETED IF ITC RECAPTURE IS NOT APPLICABLE TO THE ▇▇▇▇.] For Contract Years that are non-leap years, the ▇▇▇▇ shall be discharged no more than ▇▇▇▇ Rating x 365 MWh in each Contract Year. For Contract Years that are leap years, the ▇▇▇▇ shall be discharged no more than ▇▇▇▇ Rating x 366 MWh in each Contract Year. The ▇▇▇▇ will not be required to discharge more energy than available relative to the available state of charge. The ▇▇▇▇ may be called on to provide frequency droop response, frequency regulation response, and frequency regulation (AGC dispatch) under the following conditions: Dispatch to the grid is limited to the interconnection limit minus the generation from the PV systemWTGs. EXHIBIT B-1 REQUIRED MODELS PSS/E ASPEN PSCAD EXHIBIT B-2 GENERATOR AND ENERGY STORAGE CAPABILITY CURVE(S) ATTACHMENT C METHODS AND FORMULAS FOR MEASURING PERFORMANCE STANDARDS

Appears in 2 contracts

Sources: Power Purchase Agreement, Power Purchase Agreement