BEGINNING OF THE WORK Clause Samples

BEGINNING OF THE WORK. The contractor will begin the work within days of receiving notice from Turtle Tanks. If the contractor fails to begin the work with- in the time provided without obtaining an extension, Turtle Tanks is free to hire another contractor to perform the work. Time is of the essence.
BEGINNING OF THE WORK. 40.1 Before Work shall be started and materials ordered, the Contractor shall meet and consult with the Owner and/or Engineer relative to materials, equipment, right-of-way, schedules and all arrangements for prosecuting the Work.
BEGINNING OF THE WORK. The subcontractor will begin the work within days of receiving notice from the owner or his or her designated agent. If the sub- contractor fails to begin the work within the time provided without obtaining an extension, the owner is free to hire another subcontrac- tor to perform the work. Time is of the essence.
BEGINNING OF THE WORK. Once approved the technical documentation, the Tenant or her project Manager shall notify to the Manager the name of the companies that shall carry out the works, in forward the Contractors. • Before entering to the building, the Contractors shall present the list of the safety and hygiene documentation of the personnel that is detailed in the Attach N°1. The lists of personnel shall be authorized by the signature of the Project Manager. • Before the beginning of building’s work, the TENANT shall contract directly or through the administration of the building the following services that have as aim that the remodeling works do not harm the rest of the tenants and to the building in general: • Security Staff: it is necessary to contract additional safety personnel that control the traffic through the building of the personnel involved in the construction work of the tenant.

Related to BEGINNING OF THE WORK

  • Beginning (i) no earlier than eleven (11) weeks before the expected birth date, and (ii) no later than the actual birth date, and

  • RUNNING OF THE ACADEMY Teachers and staff

  • No-­‐Activation Period Registry Operator shall not activate any names in the DNS zone for the Registry TLD (except for "NIC") until at least 120 calendar days after the effective date of this agreement. Registry Operator may allocate names (subject to subsection 6.2 below) during this period only if Registry Operator causes registrants to be clearly informed of the inability to activate names until the No-­‐Activation Period ends.

  • Opening of Tenders Both Technical & Financial Offers submitted will be opened at the time and day specified in the advertised invitation to Tender at the offices of Abraj Energy Services. Any Tender received after the time and date fixed for submission of Tenders will be rejected.

  • Cost of the Work The sum of all allowable costs necessarily incurred and paid by Contractor in the proper performance of the Work.