Bills of Quantities Clause Samples

The 'Bills of Quantities' clause defines the requirement for a detailed, itemized list of materials, labor, and associated costs necessary for a construction project. This clause typically mandates that the contractor or a designated party prepares and submits a comprehensive breakdown of all work components, which serves as a basis for pricing, tendering, and progress payments. By providing a clear and structured account of the project's scope and associated costs, the clause ensures transparency, facilitates accurate cost control, and minimizes disputes over payment or scope changes during the project.
POPULAR SAMPLE Copied 4 times
Bills of Quantities a) The pricing of the Bills of Quantities shall be carried out in English numerals and in black ink to enable photocopying if required.
Bills of Quantities. The Bills of Quantities shall be prepared for each Package separately.
Bills of Quantities. If any ambiguity or discrepancy is found in the documents the Engineer will provide instructions clarifying the position.
Bills of Quantities. Drawings as listed in Appendix “A” to the Bills of Quantities.
Bills of Quantities. The Bills of Quantities shall be prepared for each Package separately. (i) Packages involved in the Framework Agreement (N/A)
Bills of Quantities. Note: Part 6.2 shall be duly completed and delivered together with the tender.
Bills of Quantities. Contract 81 C2.2 Construction of new 1 x 4 classrooms, construction of 1 x 3 classroom block ,1x Grade R facilities;1 x multipurpose classroom; renovate 4 x 4 enviro loo toilets, demolish 5 x 2 existing classrooms; drill and equip borehole and 20KL elevated water tanks, replace existing perimeter fencing with steel palisade fence and external works. .
Bills of Quantities. 21.1 The Bills of Quantities shall contain items for the construction, installation, testing and commissioning of the Work to be done by the Contractor. The Contractor will be paid for the quantity of the Work done at the rate in the Bills of Quantities for each item. 21.2 If the final quantity of the Work done differs from the quantity in the Bills of Quantities for the particular item by more than 25 percent and provided the change exceeds 1 percent of the Initial Contract price, the Project Manager shall adjust the rate to allow for the change. 21.3 If requested by the Project Manager, the Contractor shall provide the Project Manager with a detailed cost breakdown of any rate in the Bills of Quantities.
Bills of Quantities. C2.2.1 Payment to the contractor to accommodate Part/Full Occupational qualification and Trade qualifications learners INDEPENDENT DEVELOPMENT TRUST C3 Scope of Work
Bills of Quantities. Contract 82 C2.2 Construct 20 x ordinary classrooms, 4 x Grade R facilities, septic tank, steel palisade fence 2.1M, medium admin block, 38 x enviro ▇▇▇▇. Drill and equip borehole and provide 80KL water storage tanks (external works). .