BREAKDOWN MAINTENANCE. a) Failures involving brake adjustments, electrical failures such as connectors, contact failures, fuse wire, slip ring/brush contact failures, electrical/electronic component failure and such other failures shall be attended by the contractor as part of the AMC contract. b) Major Breakdown activities such as gearbox overhauling, opening and rectification of gears, Motors rewinding/replacement & alignment including works to be done outside IPRC on need basis. Charges for the same shall be quoted by the contractor in Annexure-B of Price bid. The payment for the Major breakdown shall be paid only after due certification by the user facility Engineer In-charge and approval of concerned Divisional Head. c) The major breakdown works not mentioned/included under the annexure of Price bid which needs to be carried out for the efficient functioning of the crane shall be done by the respective user division through separate purchase order by following due purchase procedures. d) Removing and bringing down any defective equipment/components such as motors, gear box, brakes, shafts, etc. from the crane for further repair is the responsibility of the contractor along with necessary tools and tackles/equipments. The contractor shall refit the parts immediately after repair.
Appears in 1 contract
Sources: Annual Maintenance Contract
BREAKDOWN MAINTENANCE. a) Failures involving brake system and adjustments, electrical failures such as connectors, contact failures, fuse wire, slip ring/brush contact failures, electrical/electronic component failure and such other failures shall be attended by the contractor as part of the AMC contract.
b) Major Breakdown activities such as gearbox overhauling, opening and rectification of gears, shaft machining, Motors rewinding/replacement & alignment including works to be done outside IPRC on need basis. Charges for the same shall be quoted by the contractor in Annexure-B of Price bid. The payment for the Major breakdown shall be paid only after due certification by the user facility Engineer In-charge and approval of concerned Divisional Head.
c) The major breakdown works not mentioned/included under the annexure Annexure-B of Price bid which needs to be carried out for the efficient functioning of the crane shall be done by the respective user division division/facility through separate purchase order by following due purchase procedures.
d) Removing and bringing down any defective equipment/components such as motors, gear box, brakes, shafts, etc. from the crane for further repair is the responsibility of the contractor along with necessary tools and tackles/equipments. The contractor shall refit the parts immediately after repair.
Appears in 1 contract
Sources: Annual Maintenance Contract