Breakwaters, jetties & Clause Samples

Breakwaters, jetties & groins (1) Breakwaters, jetties, and groins waterward of the ordinary high water mark shall be allowed only where necessary to support water-dependent uses, public access, shoreline stabilization, or other specific public purpose.

Related to Breakwaters, jetties &

  • LOKASI ▇▇▇ KETERANGAN HARTANAH Hartanah tersebut adalah terletak di tingkat 6 Pangsapuri Mesra Ria. Hartanah tersebut adalah pangsapuri kos rendah 3 ▇▇▇▇▇ tidur pertengahan dikenali sebagai ▇▇▇▇▇ Pemaju No. A-06-06, Tingkat No 06, Bangunan No A, Pandan Mesra ▇▇▇ beralamat pos di No. 06-06, Pangsapuri Mesra Ria, ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇. (“Hartanah”) Hartanah ini akan dijual keadaan “sepertimana sedia ada” tertakluk kepada satu harga rizab sebanyak RM150,000.00 (RINGGIT MALAYSIA SATU RATUS ▇▇▇ ▇▇▇▇ PULUH RIBU SAHAJA), mengikut kepada Syarat-syarat Jualan di sini dengan cara Penyerahan Hak dari Pemegang Serahhak ▇▇▇ tertakluk kepada Pembeli memperoleh pengesahan / kebenaran yang diperlukan daripada Pemaju ▇▇▇/atau Pemilik Tanah ▇▇▇/atau Pihak Berkuasa Negeri ▇▇▇/atau badan-badan yang relevan (jika ada). Semua penawar yang ingin membuat tawaran adalah dikehendaki membayar deposit sebanyak 10% daripada harga rizab (“deposit pendahuluan”) secara bank draf atau kasyier order dipalang “AKAUN PENERIMA SAHAJA” atas nama HONG ▇▇▇▇▇ BANK BERHAD / ▇▇▇ ▇▇▇ ▇▇▇▇ & ▇▇▇▇ ▇▇▇ MEE @ ▇▇▇▇ NYUIK THAI atau melalui pemindahan perbankan atas talian yang ditentukan oleh pelelong, sekurang-kurangnya SATU (1) HARI BEKERJA SEBELUM TARIKH LELONGAN ▇▇▇ membayar perbezaan di antara deposit pendahuluan ▇▇▇ jumlah bersamaan 10% daripada harga berjaya tawaran sama ada dengan bank draf atau kasyier order dipalang “AKAUN PENERIMA SAHAJA” atas nama ▇▇▇▇ ▇▇▇▇▇ BANK BERHAD / ▇▇▇ ▇▇▇ ▇▇▇▇ & ▇▇▇▇ ▇▇▇ MEE @ ▇▇▇▇ NYUIK THAI atau melalui pemindahan perbankan atas talian dalam masa TIGA (3) HARI BEKERJA sebaik sahaja ketukan tukul oleh Pelelong dibuat. Deposit ▇▇▇▇ ▇▇▇ jumlah perbezaan secara dikumpul dikenali sebagai “deposit”. Hari Bekerja bermaksud hari (tidak termasuk Sabtu, Ahad ▇▇▇ ▇▇▇▇ Umum) di mana Pihak Pemegang Serahhak dibuka untuk perniagaan di Kuala Lumpur Baki harga belian sepenuhnya hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh jualan lelongan kepada HONG ▇▇▇▇▇ BANK BERHAD. ▇▇▇▇ rujuk Terma & Syarat Dalam Talian Pelelong di ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ untuk ▇▇▇▇-▇▇▇▇ pembayaran deposit. Untuk butir-butir lanjut, ▇▇▇▇ berhubung dengan Tetuan ▇▇▇ ▇▇▇▇ & Co., Peguamcara bagi Pihak Pemegang Serahhak di ▇-▇, ▇▇▇▇▇ ▇▇▇ ▇/▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇, ▇▇▇▇▇▇▇▇. (Ref No.: 51303.23, Tel No.: ▇▇-▇▇▇▇▇▇▇▇, Fax No.: ▇▇-▇▇▇▇▇▇▇▇) atau Pelelong yang tersebut di bawah ini:- Suite C-20-3A, Level 20, Block C, Megan Avenue II, / ▇▇▇▇▇ ▇▇▇▇▇ BIN ▇▇▇▇▇▇ ▇▇, ▇▇▇▇▇ ▇▇▇ ▇▇▇▇ ▇▇▇▇, 50450 Kuala Lumpur. (Pelelong Berlesen) Tel No : ▇▇-▇▇▇▇ ▇▇▇▇ Fax No: ▇▇-▇▇▇▇ ▇▇▇▇ Ruj. Kami: ALIN/HLBB1604/WCC Ruj Bank : ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ Web: ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ E-mail : ▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.

  • Stormwater Management a) The Owner AGREES to implement the requirements incorporated in the Draft Plan Conditions attached as Schedule “F” and any reports submitted to Kawartha Region Conservation Authority and the City pertaining to: i) pre and post development run-off flows and water balance calculations, and the intended means of conveying stormwater flow from each Lot, Block and the entire proposed Plan of Subdivision; ii) the anticipated impact of the Plan of Subdivision on water quality and phosphorus control, as it relates to fish and fish habitat once adequate protective measures have been taken; iii) the means whereby erosion and sedimentation and their effects will be minimized on the site during and after construction; iv) the site soil conditions, including grain size distribution profiles; v) a site grading plan. b) The Owner AGREES to erect and maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period, in a manner satisfactory to Kawartha Region Conservation Authority and the City. c) Prior to the execution of this Agreement, the Owner AGREES to confirm to the City that Conservation Authority has reviewed and approved the stormwater management report and plan, erosion and sedimentation plan, and final Lot Grading Plans as required under this Section. a) UPGRADES TO EXISTING STORM SEWER b) UPGRADES TO EXISTING SANITARY SEWER