Building Siting. 3.4.1 Both buildings’ siting, massing, and scale shall generally comply with Schedules B-G. For greater clarity: (a) the total lot coverage of the two buildings shall not exceed 20%; (b) Building A shall be a minimum of 23 metres from the rear property line, not including the entrance canopy; (c) Building B shall be a minimum of 36 metres from the rear property line, not including the entrance canopy; (d) the maximum height of each building shall not exceed 13.4 metres from the established grade, excluding rooftop mechanical equipment.
Appears in 2 contracts
Sources: Development Agreement, Development Agreement