Loading After the receipt of the NOR pursuant to section 9.7, the Seller, having regard to the requirements of the Loading Terminal, Loading Terminal procedures and the time when the vessel has complied with the provisions of section 9.7.a, shall commence loading as soon as reasonably practicable.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.
Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.