Calculation of RR. Rate of Recovery or RR is calculated in accordance with the following formula: RR = (A – B)/A x 100% where: (a) A is the number of tonnes of Recyclables accepted by the Contractor at the Facility during the period; and (b) B is the number of tonnes on Residual Material recovered from the Recyclable Material delivered to the Facility during the same period.
Appears in 2 contracts
Sources: Member Contract for Services, Member Contract for Services