Calibration and Test of Meters Clause Samples

Calibration and Test of Meters. The accuracy of BAMAGAS measuring equipment shall be verified by BAMAGAS at reasonable intervals, and, if requested, in the presence of representatives of CES, but BAMAGAS shall not be required to verify the accuracy of such equipment more frequently than once in any thirty (30) day period. In the event either Party shall notify the other that it desires a special test of any measuring equipment, the Parties shall cooperate to secure a prompt verification of the accuracy of such equipment. The expense of any such special test, if called for by CES, shall be borne by CES if the measuring equipment tested is found not to be in error or to be in error not more than two percent (2%). (i) If, upon test, any measuring equipment, including recording calorimeters, is found to be in error by not more than two percent (2%), previous recordings of such equipment shall be considered accurate in computing deliveries of Natural Gas, but such equipment shall be adjusted at once to record accurately. (ii) If, upon test, any measuring equipment shall be found to be inaccurate by an amount exceeding two percent. (2%) at a recording corresponding to the average hourly rate of flow for the period since the last preceding test, then any previous recordings of such equipment shall be corrected to zero error for any period which is known definitely but in case the period is not known or agreed upon, such correction shall be for a period extending over one-half (1/2) of the time elapsed since the date of the last test, not exceeding a correction period of sixteen (16) Days.
Calibration and Test of Meters. The accuracy of all measuring equipment shall be verified by Transporter at reasonable internals, and if requested, in the presence of representatives of Shipper, but neither Shipper nor Transporter shall be required to verify the accuracy of such equipment more frequently than once in any 30-Day period, if either party at any time desires a special test of any measuring equipment, it will promptly notify the other, and the parties shall then cooperate to secure a prompt verification of the accuracy of such equipment.
Calibration and Test of Meters. The accuracy of all measuring equipment will be verified by QGM at reasonable intervals, and if requested, in the presence of Shipper, but neither Shipper nor QGM shall be required to verify the accuracy of the equipment more frequently than once in a 30-day period. If either party desires a special test of any measuring equipment, it will promptly notify the other, and the parties shall then cooperate to secure TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). a prompt verification of the accuracy of the equipment. The party requesting the special test shall bear all costs.
Calibration and Test of Meters. Each Party shall have the right to have representatives present at the time of any installing, cleaning, changing, repairing, inspecting, testing, calibrating or adjusting done in connection with the other Party's measurement equipment. Gatherer shall test and calibrate its Receipt Point Meters no less than six (6) months after installation and activation of each meter and no less than every six (6) months thereafter. Gatherer shall test and calibrate its Delivery Point Meters no less than each month upon activation. In the event either Party shall notify the other that it desires a special test of a Meter, a check meter, or a calorimeter, as the case may be, the Parties shall cooperate to secure prompt verification of the accuracy of such equipment. Each Party shall give to the other Party sufficient advance notice of the time of all such special tests so that the other Party may conveniently have its representatives present. The Party requesting the special test shall bear the costs of such test.

Related to Calibration and Test of Meters

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes. 3.8.2 The inspections and tests may be conducted in the premises of the tenderer or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination If conducted on the premises of the tenderer or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring entity. 3.8.3 Should any inspected or tested goods fail to conform to the Specifications, the Procuring entity may reject the equipment, and the tenderer shall either replace the rejected equipment or make alterations necessary to make specification requirements free of costs to the Procuring entity. 3.8.4 The Procuring entity’s right to inspect, test and where necessary, reject the goods after the Goods’ arrival shall in no way be limited or waived by reason of the equipment having previously been inspected, tested and passed by the Procuring entity or its representative prior to the equipment delivery. 3.8.5 Nothing in paragraph 3.8 shall in any way release the tenderer from any warranty or other obligations under this Contract.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.