Capacity Resource Election Clause Samples

The Capacity Resource Election clause defines how a party selects or designates specific resources to fulfill capacity obligations under an agreement. In practice, this clause outlines the process and criteria for identifying which generating units, facilities, or assets will be used to meet capacity requirements, often including deadlines for notification and any necessary documentation. Its core function is to ensure both parties have clarity and certainty regarding which resources are committed, thereby reducing the risk of disputes or non-compliance with regulatory or contractual capacity obligations.
Capacity Resource Election. The Generation Interconnection Customer may elect to operate all or a portion of its Customer Facility as a Capacity Resource only to the extent that the Interconnection Service Agreement grants Capacity Interconnection Rights. Such an election may include all or any portion of the Customer Facility’s capacity for which Capacity Interconnection Rights have been granted.

Related to Capacity Resource Election

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • EPP query-­‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a query command plus the reception of the EPP response for only one EPP query command. It does not include packets needed for the start or close of either the EPP or the TCP session. EPP query commands are those described in section 2.9.2 of EPP RFC 5730. If the RTT is 5-­‐times or more the corresponding SLR, the RTT will be considered undefined.

  • EPP command RTT Refers to “EPP session-­‐command RTT”, “EPP query-­‐command RTT” or “EPP transform-­‐command RTT”.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.