Certain Installations, Modifications or Construction. Subject to the proviso in Section 3.04(a) and notwithstanding Section 3.03(a), no installation of, modifications to, or new construction of, facilities, equipment, systems or access thereto, including rights of way, fences and gates, shall be made by either Party which results in or could be reasonably expected to result in physical damage to Seller' Assets or Buyer Assets, as the case may be, or otherwise results in or could be reasonably expected to result in personal injury or loss of life, physical damage or physical harm to property, the Generating Facilities, the Transmission System or any other transmission system to which it is interconnected, or damage or harm to System Integrity or public safety, without (i) prior written consent (which consent shall not be unreasonably withheld) and (ii) compliance by such Party with the information requirements of Section 3.03 (c).
Appears in 1 contract
Certain Installations, Modifications or Construction. Subject to the proviso in Section 3.04(a) and notwithstanding Section 3.03(a), no installation of, modifications to, or new construction of, facilities, equipment, systems or access thereto, including rights of way, fences and gates, shall be made by either Party which results in or could be reasonably expected to result in physical damage to Seller' Seller Assets or Buyer Assets, as the case may be, or otherwise results in or could be reasonably expected to result in personal injury or loss of life, physical damage or physical harm to property, the Generating Facilities, the Transmission System or any other transmission transmission, system to which it is interconnected, or damage or harm to System Integrity or public safety, without (i) prior written consent (which consent shall not be unreasonably withheld) and (ii) compliance by such Party with the information requirements of Section 3.03 (c3.03(c).
Appears in 1 contract