Common use of Certificate of Conformity Clause in Contracts

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.

Appears in 25 contracts

Sources: Provision of Df186 – Mod Data Framework, Viking Combined Support Contract, Provision of a Flight Tasking Management System

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 Condition 17 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 2625.

Appears in 8 contracts

Sources: Contract for the Provision of Services, Contract for the Provision of Goods and Services, Contract for Strategic Analysis Support

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 A23 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification Specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26B10.

Appears in 7 contracts

Sources: Supply Agreement, Supply Agreement, Supply Agreement

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 clause A23 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details Details of any approved concessions; (5) acquirer Acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description Description of Contractor Deliverable, including part number, specification Specification and configuration status; (9) identification Identification marks, batch and serial numbers in accordance with the Specification; (10) quantitiesQuantities; (11) a A signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26B10.

Appears in 5 contracts

Sources: Supply Agreement, Procurement Contract, Contract

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s 's Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s 's Records). c. The Information provided on the CofC shall include: (1) Contractor’s 's name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.

Appears in 4 contracts

Sources: Contract, Intelligent Ship Phase 3 Contract, Contract

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.clause

Appears in 3 contracts

Sources: Contract for Sales Management System, Contract for Provision of Covid Testing Machines and Equipment, Modification Agreement

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 clause A23 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details Details of any approved concessions; (5) acquirer Acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description Description of Contractor Deliverable, including part number, specification Specification and configuration status; (9) identification Identification marks, batch and serial numbers in accordance with the Specification; (10) quantitiesQuantities; (11) a A signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26B10.

Appears in 3 contracts

Sources: Purchase Agreement, Procurement Agreement, Contract for Repair Services

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition Condition 18 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.

Appears in 2 contracts

Sources: Repair and Refurbishment Agreement, Contract for Repair and Refurbishment

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 Condition 17 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification;; instructions; DEFFORM 129J in accordance with the (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 2625.

Appears in 1 contract

Sources: Contract for the Procurement of Breaching Shotgun

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 Condition 17 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.

Appears in 1 contract

Sources: Contract for the Provision of Training Vouchers

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 Condition 17 (Contractor’s Records). c. The Information provided on the CofC shall includeinclude the following: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. (12) servicing dates, scheduled service dates. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 2625.

Appears in 1 contract

Sources: Master Contract

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.shall

Appears in 1 contract

Sources: Contract for the Provision of Pre Flight Messaging Test Facility and System Test Facility Rigs

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Deliverydelivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s Contractors Records). c. The Information information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information information called for at clause 26.

Appears in 1 contract

Sources: Supply Agreement

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26.the

Appears in 1 contract

Sources: Supply Agreement

Certificate of Conformity. a. Where required in Schedule 3 (Contract Data Sheet) the Contractor shall provide a Certificate of Conformity (CofC) in accordance with Schedule 2 (Schedule of Requirements) and any applicable Quality Plan. One copy of the CofC shall be sent to the Authority’s Representative (Commercial) upon Delivery, and one copy shall be provided to the Consignee upon Delivery. b. The Contractor shall consider the CofC to be a record in accordance with condition 18 A23 (Contractor’s Records). c. The Information provided on the CofC shall include: (1) Contractor’s name and address; (2) Contractor unique CofC number; (3) Contract number and where applicable Contract amendment number; (4) details of any approved concessions; (5) acquirer name and organisation; (6) Delivery address; (7) Contract Item Number from Schedule 2 (Schedule of Requirements); (8) description of Contractor Deliverable, including part number, specification Specification and configuration status; (9) identification marks, batch and serial numbers in accordance with the Specification; (10) quantities; (11) a signed and dated statement by the Contractor that the Contractor Deliverables comply with the requirements of the Contract and approved concessions. Exceptions or additions to the above are to be documented. d. Where Schedule 2 (Schedule of Requirements) and any applicable Quality Plan require demonstration of traceability and design provenance through the supply chain the Contractor shall include in any relevant subcontract the requirement for the Information called for at clause 26B10.

Appears in 1 contract

Sources: Contract for the Provision and Installation of Parade Ground Stands