CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 38 contracts
Sources: Job Order Contracting Agreement, Construction Contract, Construction Contract
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 8.1 The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
8.2 The Contractor shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
8.3 The Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. .
8.4 All materials used on this Project shall be certified as non not Asbestos Containing Building Materials (ACBM). The Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: :
8.4.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
8.4.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
8.4.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor Protection
8.5 The Contractor shall provide at Substantial Completion, a notarized statement affidavit to the Owner stating that no ACBM has been used, asbestos containing materials or work was provided, installed, furnished or left on this added to the Project. .
8.6 The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. inspector.
8.7 At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. Chapter 295.34, par. paragraph c.1 that no ACBM was used during construction of the Project. Prior to issuing this certification, the Contractor shall cause every subcontractor to provide a notarized statement that no ACBM has been used, provided, or left on this Project.
Appears in 5 contracts
Sources: Construction Contract, Construction Contract, Construction Contract
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The 22.1 With each material submittal for the Project, Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material Safety Data Sheet (SDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. The .
22.2 Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-third- party asbestos monitoring. The .
22.3 Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The .
22.4 Design/Build Contractor shall take whatever measures he it deems necessary to insure ensure that all employees, suppliers, fabricators, material menmaterialmen, subcontractorsSubcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors its Subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C;
22.5.4 Every subcontractor Subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The .
22.6 Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets Safety Data Sheets (MSDSSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer A/E who will compile the information from the MSDS SDS and, finding no asbestos in any of the product, make a certification statement. .
22.7 At Final Completion the Completion, Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 3 contracts
Sources: Design/Build Agreement, Design/Build Agreement, Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor 22.1 Construction Manager shall provide a certification statement, included statement with each materials submittal, submittal stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor .
22.2 Construction Manager shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor .
22.3 Construction Manager shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor .
22.4 Construction Manager shall take whatever measures he deems necessary to insure ensure that all employees, suppliers, fabricators, material menmaterialmen, subcontractorsSubcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Contractor Construction Manager shall insure compliance with the following acts from all of his subcontractors its Subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Protection
22.6 Every subcontractor Subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor .
22.7 Construction Manager shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer A/E who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.8 At Final Completion the Contractor Completion, Construction Manager shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Manager at Risk Agreement, Construction Manager at Risk Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 22.1 The Contractor Construction Manager shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Contractor Construction Manager shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Contractor Construction Manager shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Contractor Construction Manager shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor Construction Manager shall insure compliance with the following acts from all of his subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Protection
22.6 Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.7 The Contractor Construction Manager shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.8 At Final Completion the Contractor Construction Manager shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Manager Agreement, Construction Manager at Risk Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ) Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Protection) Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 22.1 The Contractor Construction Manager shall provide a certification statement, included statement with each materials submittal, submittal stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Contractor Construction Manager shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Contractor Construction Manager shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Contractor Construction Manager shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractorsSubcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Contractor Construction Manager shall insure compliance with the following acts from all of his subcontractors its Subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Protection
22.6 Every subcontractor Subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.7 The Contractor Construction Manager shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.8 At Final Completion Completion, the Contractor Construction Manager shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Manager Agreement, Construction Manager Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor shall insure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇1, ▇▇Ch. ▇▇▇▇295C, ▇▇▇▇▇▇▇▇ Asbestos Health Protection Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The 22.1 With each material submittal for the Project, the Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material safety data sheet (MSDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Design/Build Contractor shall take whatever measures he it deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractorsSubcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors its Subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C;
22.5.4 Every subcontractor Subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.6 The Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.7 At Final Completion Completion, the Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The With each material submittal for the Project, the Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material safety data sheet (MSDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. The Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Design/Build Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C; Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The 22.1 With each material submittal for the Project, the Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material safety data sheet (MSDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Design/Build Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C;
22.5.4 Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.6 The Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.7 At Final Completion the Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The Contractor Construction Manager shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. The Contractor Construction Manager shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor Construction Manager shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. The Contractor Construction Manager shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor Construction Manager shall insure compliance with the following acts from all of his subcontractors and assigns: Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. The Contractor Construction Manager shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. At Final Completion the Contractor Construction Manager shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Construction Manager Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The 22.1 With each material submittal for the Project, the Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material safety data sheet (MSDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Design/Build Contractor shall take whatever measures he it deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractorsSubcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors its Subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C;
22.5.4 Every subcontractor Subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.6 The Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.7 At Final Completion Completion, the Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 22.1 The Contractor Construction Manager shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Contractor Construction Manager shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Contractor Construction Manager shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Contractor Construction Manager shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Contractor Construction Manager shall insure compliance with the following acts from all of his subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇1, ▇▇Ch. ▇▇▇▇295C, ▇▇▇▇▇▇▇▇ Asbestos Health Protection Protection
22.6 Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.7 The Contractor Construction Manager shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.8 At Final Completion the Contractor Construction Manager shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. .
c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Solicitation Amendment
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. The 22.1 With each material submittal for the Project, the Design/Build Contractor shall provide a certification statement, included with each materials submittal, stating material safety data sheet (MSDS) and a statement certifying that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Design/Build Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. .
22.3 The Design/Build Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.4 The Design/Build Contractor shall take whatever measures he deems necessary to insure that all employees, suppliers, fabricators, material menmaterialmen, subcontractors, or their assigns, comply with this requirement. .
22.5 All materials used on this Project shall be certified as non Asbestos Containing Building Materials (ACBM). The Design/Build Contractor shall insure compliance with the following acts from all of his subcontractors and assigns: :
22.5.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
22.5.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
22.5.3 Texas Asbestos Health Protection Rules (TAHRP—Rules, 25 Tex. Admin. Code Title 25, Part ▇, ▇▇Ch. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection 295 Subchapter C;
22.5.4 Every subcontractor shall provide a notarized statement that no ACBM has been used, provided, or left on this Project. .
22.6 The Design/Build Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. .
22.7 At Final Completion the Design/Build Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, ChTex. 295.34, parAdmin. c.1 Code § 295.34c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Design/Build Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 22.1 The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
22.2 The Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
22.3 The Contractor shall take whatever measures he deems necessary to insure ensure that all employees, suppliers, fabricators, material menhandlers, subcontractors, or their assigns, comply with this requirement. .
22.4 All materials used on this Project shall be certified as non non-Asbestos Containing Building Materials (ACBM). The Contractor shall insure ensure compliance with the following acts from all of his subcontractors and assigns: Subcontractors:
22.4.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7));
22.4.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; Asbestos 22.4.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor Protection)
22.5 The Contractor shall provide a notarized statement from all subcontractors that no ACBM has been used, provided, installed, furnished, added to, or left on this the Project. The .
22.6 At Substantial Completion the Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of State Health Services licensed inspector or Project Architect or Engineer who will inspector. The contractor shall provide a person appropriately licensed in accordance with the provisions of the Texas Administration Code, Title 25, Part 1, Ch. 295C, and compile the information from the MSDS andmaterial safety data sheets of all products used in the construction or renovation, and finding no asbestos in any of those products, prepare a signed written certification that he/she has reviewed the productMSDSs for all products used in the construction and that none of those products contain ACBM and; therefore, make a certification statement. the building materials do not contain asbestos.
22.7 At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. 295.34, par. c.1 that no ACBM was used during construction of the Project.
Appears in 1 contract
Sources: Construction Manager Agreement
CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK. 8.1 The Contractor shall provide a certification statement, included with each materials submittal, stating that no asbestos containing materials or work is included within the scope of the proposed submittal. .
8.2 The Contractor shall insure ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring. The Contractor shall provide at Substantial Completion, a notarized affidavit to the Owner and the Architect stating that no asbestos containing materials or work was provided, installed, furnished or added to the Project. .
8.3 The Contractor shall take whatever measures he deems necessary to insure ensure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. .
8.4 All materials used on this Project shall be certified as non not Asbestos Containing Building Materials (ACBM). The Contractor shall insure ensure compliance with the following acts from all of his subcontractors and assigns: :
8.4.1 Asbestos Hazard Emergency Response Act (AHERA—40 CFR 763-99 (7)); ;
8.4.2 National Emission Standards for Hazardous Air Pollutants (NESHAP—EPA 40 CFR 61, National Emission Standard for Asbestos; ;
8.4.3 Texas Asbestos Health Protection Rules (TAHRP—Tex. Admin. Code Title 25, Part ▇, ▇▇. ▇▇▇▇, ▇▇▇▇▇▇▇▇ Health Protection Every subcontractor Protection
8.5 The Contractor shall provide at Substantial Completion, a notarized statement affidavit to the Owner stating that no ACBM has been used, asbestos containing materials or work was provided, installed, furnished or left on this added to the Project. .
8.6 The Contractor shall provide, in hard copy and electronic form, all necessary material safety data sheets (MSDS) of all products used in the construction of the Project to the Texas Department of Health licensed inspector or Project Architect or Engineer who will compile the information from the MSDS and, finding no asbestos in any of the product, make a certification statement. inspector.
8.7 At Final Completion the Contractor shall provide a notarized certification statement per TAC Title 25 Part 1, Ch. Chapter 295.34, par. paragraph c.1 that no ACBM was used during construction of the Project. Prior to issuing this certification, the Contractor shall cause every subcontractor to provide a notarized statement that no ACBM has been used, provided, or left on this Project.
Appears in 1 contract
Sources: Construction Contract