CFP8 FUNCTIONAL BLOCK DIAGRAM Clause Samples

The CFP8 Functional Block Diagram clause defines the required structure and interconnections of the CFP8 module's internal components. It typically outlines the arrangement of key functional blocks such as electrical interfaces, optical interfaces, control logic, and power management within the module, often referencing a standardized diagram. This clause ensures that all parties have a clear and consistent understanding of the module's architecture, facilitating interoperability and simplifying integration into larger systems.
CFP8 FUNCTIONAL BLOCK DIAGRAM. Figure 1-1: CFP8 Functional Block Diagram
CFP8 FUNCTIONAL BLOCK DIAGRAM. ‌ 2 Figure 1- 1: CFP8 Func tional Bloc k Diagram

Related to CFP8 FUNCTIONAL BLOCK DIAGRAM

  • CUSTOMER SERVICE FUNCTIONS The Servicer shall handle all Customer inquiries and other Customer service matters according to the same procedures it uses to service Customers with respect to its own charges.

  • Additional Functions Upon receipt of Proper Instructions, the Custodian shall take all such other actions as specified in such Proper Instructions and as shall be reasonable or necessary with respect to Repurchase Agreement transactions and the Securities and funds transferred and received pursuant to such transactions, including, without limitation, all such actions as shall be prescribed in the event of a default under a Repurchase Agreement.

  • MANAGEMENT FUNCTIONS B.1 The Association recognizes that the management of the Hospital and the direction of working forces are fixed exclusively in the Hospital and shall remain solely with the Hospital except as specifically limited by the provisions of this Agreement and, without restricting the generality of the foregoing, the Association acknowledges that it is the exclusive function of the Hospital to: (a) maintain order, discipline and efficiency; (b) hire, assign, retire, discharge, direct, promote, demote, classify, transfer, lay- off, recall, and suspend or otherwise discipline nurses, provided that a claim of discharge or discipline without just cause may be the subject of a grievance and dealt with as hereinafter provided; (c) determine, in the interest of efficient operation and high standards of service, job rating and classification, the hours of work, work assignments, methods of doing the work, and the working establishment for the service; (d) generally to manage the operation that the Hospital is engaged in and, without restricting the generality of the foregoing, to determine the number of personnel required, methods, procedures, and equipment in connection therewith; (e) make, enforce, and alter from time to time reasonable rules and regulations to be observed by the nurses which are not inconsistent with the provisions of this Agreement. B.2 These rights shall not be exercised in a manner inconsistent with the provisions of this Agreement.

  • Drug Free Work Place Grantee shall establish and maintain a drug-free work place policy.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.