Change in Use of the Project Sample Clauses

Change in Use of the Project. ‌ The Recipient reasonably expects to use all of the Bond Funded Portion of the Project Funds and the Project for the entire stated term to maturity of the Obligation. Absent an opinion of Nationally-Recognized Bond Counsel to the effect that such use of the Bond Funded Portion of the Project Funds will not adversely affect the exclusion from federal gross income of interest on the Bonds pursuant to Section 103 of the Code, the Recipient will use the Bond Funded Portion of the Project Funds and the Project solely as set forth in this Agreement.
Change in Use of the Project. The District reasonably expects to use all Project Funds and the MST Project for the entire stated term to maturity of the Obligation. Absent an opinion of Nationally-Recognized Bond Counsel to the effect that such use of Project Funds will not adversely affect the exclusion from federal gross income of interest on the Bonds pursuant to Section 103 of the Code, the District will use all Project Funds and the MST Project solely as set forth in the SRF Loan Agreement.

Related to Change in Use of the Project

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Parties further agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Construction of the Project The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Completion of the Project The Participating County acknowledges it is obligated to undertake and complete the design and construction of the Project in compliance with all of the applicable terms and conditions of the Project Documents and the Participating County agrees to use its best efforts to cause the completion of design and construction of the Project in compliance with the applicable terms and conditions of such documents. The Participating County agrees to complete the Project in accordance with this Agreement and consistent with the scope, cost and schedule established by the Board and attached hereto in Exhibit A, as such scope, cost and schedule may be modified with the approval of Finance and the recognition of the Board.

  • Scope of the Project Under this Agreement, the scope of the Project (the “Scope of the Project”) shall mean and include: (a) construction of the Project Highway on the Site set forth in Schedule- A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D; (b) maintenance of the Project Highway in accordance with the provisions of this Agreement and in conformity with the requirements set forth in Schedule-E; and (c) performance and fulfilment of all other obligations of the Contractor in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement.

  • Use of the Property 3.9.1 To use the Property for the purpose of a private residence only in the occupation of the Permitted Occupant and not for business purposes. 3.9.2 Not to remove the Fixtures and Fittings of the Property or to store them in any way or place within or outside the Property that may reasonably lead to damage to the items or to the items deteriorating more quickly than if they had remained in the same location as at the beginning of the Tenancy. 3.9.3 Not to use the Property for any immoral or illegal purpose. 3.9.4 Not to register a company at the address of the Property. 3.9.5 Not to operate a business trade or profession from the Property. 3.9.6 Not to use consume or allow to be used or consumed any drugs or any other substance which is, or becomes, prohibited or restricted by law; 3.9.7 Not to smoke, vape or smoke e-cigarettes or permit any other resident in the Property or any guest or visitor to smoke tobacco, vape or smoke e-cigarettes or any other substance in the Property or to burn or allow any other person to burn any candles, incense sticks (or similar) without the Landlord's prior written consent. If in breach of this clause, the Tenant will be in breach of this Agreement and liable for or to compensate the Landlord in damages for the cleaning of the carpets to a professional standard and the cleaning of the curtains by whatever method is specified for the type of curtain material and the washing down of walls and redecoration if necessary to rid the Property of the odour of nicotine, incense, or any other substance caused by the Tenant or any visitor to the Property and to restore the interior to the condition described in the Inventory and Schedule of Condition if damaged through unauthorised use of candles, incense sticks, (or similar) or smoking in the Property. 3.9.8 Not to use the Property or allow others to use the Property so as to cause a nuisance, annoyance, or cause damage to any neighbouring, adjoining or adjacent Property or the owners or occupiers thereof. This shall include any nuisance caused by noise. 3.9.9 Not to decorate, make any alterations, or additions to or in the Property or puncture walls, timbers or other parts of the Property without the prior written consent of the Landlord or the Agent. 3.9.10 Not to hang any posters, pictures or other items in the Property using blu-tack, sellotape, nails, adhesive, or their equivalents but only by using a reasonable number of commercial picture hooks; 3.9.11 Not to place any aerial, satellite dish, notice, advertisement, sign or board on or in the Property without the prior consent of the Landlord. In the event such consent be given the Tenant will prior to removing from the property remove such equipment and make good and redecorate as reasonably required. 3.9.12 Not to remove, dispose of and if necessary repair any item or rectify and make good any damage due to the actions or inaction of the Tenant without the Landlord’s consent. 3.9.13 Not to keep any dangerous or inflammable goods, materials or substances in or on the Property, apart from small quantities of fuel, and other items, stored in a safe manner, required for general domestic household use. 3.9.14 Not to or permit barbecue in or on the Property including any balcony, roof terrace or garden if the Property is subject to a head lease; or if the Property is freehold to barbecue only in designated areas as agreed in writing with the Landlord or the Agent; 3.9.15 Not to use or gain access to any loft space or area at the Property except in the case of an extreme emergency. 3.9.16 To inform the Landlord or the Landlord’s Agent upon each and every occasion that access to the loft space or area is gained with clarification of the circumstances of the emergency which lead to the access. 3.9.17 Not to hold or allow any sale by auction at the Property. 3.9.18 To empty any septic tank or treatment plant regularly and at the end of the Tenancy if it has been emptied prior to the start of the Tenancy and proof provided to the Tenant by the Landlord or the Landlord’s Agent if applicable; 3.9.19 To keep the oil or LPG tank filled during and at the end of the Tenancy and provide proof to the Landlord or the Landlord’s Agent provided it was filled at the commencement of the Tenancy; 3.9.20 To pay any call out charges if the oil or LPG tank runs dry and the oil or LPG system has to be bled to remove an air lock if applicable; 3.9.21 To run all taps in sinks, basins and baths, flush lavatories and run any showers for twenty minutes upon taking up occupation and after the property has been vacant for any period of seven days or more, to reduce any risk against legionella. 3.9.22 To regularly top up any water softener left at the property with the correct salts at the Tenants own expense. 3.9.23 To not introduce into the Property any portable heaters fired by liquid or bottled gas fuels. 3.9.24 To comply with any requirements of the local authority for collection of recycling and/or garden waste. 3.9.25 To comply with the Gas Safety Regulations relating to the Property and in particular to do the following: 3.9.25.1 Not to block any ventilation in the Property and in particular ducts provided to comply with gas safety. 3.9.25.2 To report promptly to the Landlord or the Landlord’s Agent any brown or sooty build-up on or around any gas appliance.