Common use of CHANGE ORDER PROVISIONS Clause in Contracts

CHANGE ORDER PROVISIONS. 3.1 In the event any article, phrase, provision, portion or part of the Agreement or Change Order is deemed invalid, against public policy, void or otherwise unenforceable by a court of competent jurisdiction, the parties shall negotiate in good faith an equitable adjustment in the affected provision of the Agreement; however, the validity and enforceability of the remaining parts thereof and any other part or provision of the Agreement shall be otherwise fully enforceable. PO6030i Pole Install pole up to and including 50' augering the hole Includes backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove excess spoils. If multiple methods are used to excavate the hole, then the last excavation technique will be used to select appropriate unit. PO6031i Pole Install pole up to and including 50' hand digging the hole PO6032i Pole Install pole up to and including 50' rock drilling the hole. Rock drill/ledge machine must be used. PO6033i Pole Install pole up to and including 50' vac excavating the hole PO6034i Pole Install pole up to and including 50' using a back hoe to excavate the hole PO6030r Pole Remove pole up to and including 50' all types Includes removal, excavation, backfilling, debris removal and all cuts. PO6070i Pole Install pole over 50' augering the hole Includes backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove excess spoils. If multiple methods are used to excavate the hole, then the last excavation technique will be used to select appropriate unit. PO6071i Pole Install pole over 50' hand digging the hole PO6072i Pole Install pole over 50' rock drilling the hole PO6073i Pole Install pole over 50' vac excavating the hole PO6074i Pole Install pole over 50' using a back hoe to excavate the hole PO6070r Pole Remove pole over 50' all types Includes removal, excavation, backfilling, debris removal and all cuts. PO6090i Pole Install barrel Includes machine excavation w/ backhoe, backfilling & debris removal. No differentiation between Highway & Off Road (covered under pole installation unit) PO6090r Pole Remove barrel Includes machine excavation w/ backhoe, backfilling & debris removal. PO6110n Pole Hold pole Includes labor & equipment to hold pole for an hour. Not to be used with cut & kick. PO6120n Pole Shift pole / cut and kick up to and including 50 FT wood Includes cut and shift to set in place, re-excavation (re-auger / hand-dig) if necessary, backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove butt and excess spoils. Not a differential unit includes pole set. PO6122n Pole Shift pole / cut and kick over 50 FT wood Includes cut and shift to set in place, re-excavation (re-auger / hand-dig) if necessary, backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove butt and excess spoils. Not a differential unit includes pole set.

Appears in 1 contract

Sources: Agreement Change Order

CHANGE ORDER PROVISIONS. 3.1 In the event any article, phrase, provision, portion or part of the Agreement or Change Order is deemed invalid, against public policy, void or otherwise unenforceable by a court of competent jurisdiction, the parties shall negotiate in good faith an equitable adjustment in the affected provision of the Agreement; however, the validity and enforceability of the remaining parts thereof and any other part or provision of the Agreement shall be otherwise fully enforceable. PO6030i Pole Install pole up to and including 50' augering the hole Includes backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove excess spoils. If multiple methods are used to excavate the hole, then the last excavation technique will be used to select appropriate unit. PO6031i Pole Install pole up to and including 50' hand digging the hole $ PO6032i Pole Install pole up to and including 50' rock drilling the hole. Rock drill/ledge machine must be used. $ PO6033i Pole Install pole up to and including 50' vac excavating the hole $ PO6034i Pole Install pole up to and including 50' using a back hoe to excavate the hole $ PO6030r Pole Remove pole up to and including 50' all types Includes removal, excavation, backfilling, debris removal and all cuts. PO6070i Pole Install pole over 50' augering the hole Includes backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove excess spoils. If multiple methods are used to excavate the hole, then the last excavation technique will be used to select appropriate unit. $ PO6071i Pole Install pole over 50' hand digging the hole $ PO6072i Pole Install pole over 50' rock drilling the hole $ PO6073i Pole Install pole over 50' vac excavating the hole $ PO6074i Pole Install pole over 50' using a back hoe to excavate the hole $ PO6070r Pole Remove pole over 50' all types Includes removal, excavation, backfilling, debris removal and all cuts. PO6090i Pole Install barrel Includes machine excavation w/ backhoe, backfilling & debris removal. No differentiation between Highway & Off Road (covered under pole installation unit) PO6090r Pole Remove barrel Includes machine excavation w/ backhoe, backfilling & debris removal. PO6110n Pole Hold pole Includes labor & equipment to hold pole for an hour. Not to be used with cut & kick. PO6120n Pole Shift pole / cut and kick up to and including 50 FT wood Includes cut and shift to set in place, re-excavation (re-auger / hand-dig) if necessary, backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove butt and excess spoils. Not a differential unit includes pole set. $ PO6122n Pole Shift pole / cut and kick over 50 FT wood Includes cut and shift to set in place, re-excavation (re-auger / hand-dig) if necessary, backfill hole, tamp backfill, pole tags, numbering, reflectors, cover-up as required and remove butt and excess spoils. Not a differential unit includes pole set.. $

Appears in 1 contract

Sources: Agreement Change Order