Check Measurement. At the Receipt Point(s) SELLER may install check measuring equipment at its own cost and expense; provided, such equipment shall be so installed as not to interfere with the operations of the BUYER. BUYER’s meter shall be the meter used for all measurement purposes. BUYER and SELLER, in the presence of each other, shall have access to the other’s measuring equipment at all reasonable times; but the reading, calibrating, and adjusting thereof, and the changing of charts, if any, shall be done only by the owner of the meter or its representative unless otherwise agreed. Each party shall give notice sufficiently in advance, and the other parties notified shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with the other’s measuring equipment; provided, however, failure of either party so notified to witness such an operation after due notification shall not affect the validity of such operation in any way.
Check Measurement. Producer may install and operate check-measuring equipment that does not interfere with Processor’s measurement and testing. Processor and Producer shall each have the right to inspect the equipment of the other, and the charts and other measurement and testing data of the other, at all times during business hours; but the reading, calibration and adjustment of any equipment and changing of charts shall be done only by the Party owning the equipment. Each Party will preserve all original test data, charts, and other similar records for a period of at least two (2) years.
Check Measurement. Northern Border shall have the right to install check measurement. Such check measurement shall be of a type acceptable to both Parties and shall be installed in such a manner as to not interfere with the operation of the gas metering equipment. In the event it is determined by both Parties that the gas metering equipment are measuring incorrectly, then the Parties agree to use said check measurement for determination of the custody transfer volumes until such time that the Parties mutually agree that the cause of any errors in measurement has been corrected.
Check Measurement. Either Party may install check measurement facilities at its own cost and expense as long as the check measurement facilities do not interfere with the custody transfer meter and equipment.
Check Measurement. Either party to this Agreement may install check measurement facilities at its own cost and expense as long as the check measurement facilities do not interfere with the custody transfer meter and equipment.
Check Measurement. The actual work executed is to be checked by the higher officer as per the delegation of powers.
Check Measurement. Southern shall have the right to install check measurement facilities at any time during the term of this Agreement as long as such facilities do not interfere with HPL’s custody transfer measurement.

Related to Check Measurement

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Performance Measurement The Uniform Guidance requires completion of OMB-approved standard information collection forms (the PPR). The form focuses on outcomes, as related to the Federal Award Performance Goals that awarding Federal agencies are required to detail in the Awards.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point ▇▇▇▇▇▇. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.