CLEANING OF SITE. 2.2.8.1 Design/Builder shall maintain the Site and regularly remove construction debris, rubbish and waste materials resulting from the Work. After completing Work in an area, Design/Builder shall clean the area, including, as applicable, washing all glazing and window frames inside and outside throughout the Project building(s), removing all stains, paint, etc., from same, and removing from the Site all debris, rubbish and waste materials, as well as its construction equipment, tools, machinery, and surplus materials. Design/Builder shall take necessary action to ensure that dust and debris resulting from the Work are minimized and confined. Design/Builder shall not be required to clean areas or remove any materials, debris or waste materials left by Owner or Owner’s Other Contractors.
Appears in 1 contract
Sources: Design/Build Agreement
CLEANING OF SITE. 2.2.8.1 2.02.08.01 Design/Builder shall maintain the Site and regularly remove construction debris, rubbish and waste materials resulting from the Work. After completing Work in an area, Design/Builder shall clean the area, including, as applicable, including washing all glazing and window frames inside and outside throughout the Project building(s), removing all stains, paint, etc., from same, and removing from the Site all debris, rubbish and waste materials, as well as its construction equipment, tools, machinery, and surplus materials. Design/Builder shall take necessary action to ensure that dust and debris resulting from the Work are minimized and confined. Design/Builder shall not be required to clean areas or remove any materials, debris or waste materials left by Owner or Owner’s Other Contractors.to
Appears in 1 contract
Sources: Design/Build Agreement