Communication Protocols. The Parties shall agree to the communication protocols outlined in Appendix 20.05 to facilitate the exchange of information between the Parties. Writing Requirements. In documenting and confirming Dispatch Notices, conversations between the Parties’ personnel and contractors may be recorded by tape or other electronic means and any such recording will satisfy any “writing” requirements under Applicable Laws. ARTICLE TWENTY-ONE METERING, COMMUNICATIONS, AND TELEMETRY (PUT DELIVERY PERIODS) SCE Access. All communication, metering, telemetry, and associated generation operation equipment will be centralized into the Project’s Distributed Control System (“DCS”). Seller shall configure each Generating Unit’s DCS so that SCE may access it during any Put Delivery Period via the Generation Management System (“GMS”) from SCE’s Generation Operations Center (“GOC”). Seller shall ensure that the access link will provide a monitoring and control interface to enable automatic dispatch of each Generating Unit. Seller shall link the systems via an approved SCE communication network, utilizing existing industry standard network protocol, as approved by SCE. The connection will be bidirectional in nature and used by the Parties to exchange all data points to and from the GOC.
Appears in 1 contract
Sources: Resource Adequacy Purchase Agreement
Communication Protocols. The Parties shall agree to the communication protocols outlined in Appendix 20.05 to facilitate the exchange of information between the Parties. Writing Requirements. In documenting and confirming Dispatch Notices, conversations between the Parties’ personnel and contractors may be recorded by tape or other electronic means and any such recording will satisfy any “writing” requirements under Applicable Laws. ARTICLE TWENTY-ONE METERING, COMMUNICATIONS, AND and TELEMETRY (PUT DELIVERY delivery PERIODS) SCE Access. All communication, metering, telemetry, and associated generation operation equipment will be centralized into the Project’s Distributed Control System (“DCS”). Seller shall configure each Generating Unit’s DCS so that SCE may access it during any Put Delivery Period via the Generation Management System (“GMS”) from SCE’s Generation Operations Center (“GOC”). Seller shall ensure that the access link will provide a monitoring and control interface to enable automatic dispatch of each Generating Unit. Seller shall link the systems via an approved SCE communication network, utilizing existing industry standard network protocol, as approved by SCE. The connection will be bidirectional in nature and used by the Parties to exchange all data points to and from the GOC.
Appears in 1 contract
Sources: Resource Adequacy Purchase Agreement