Conceptual Design Report. Prepare a Conceptual Design Report: The report will establish and indicate project specific design criteria and standards within the Conceptual Design Report (including ADA requirements). Include all design assumptions for pipe sections, sizes, design life, design criteria, and reference of design resources, etc.. Engineer shall use the City Infrastructure Design Criteria Manual, Supplemental Criteria (Included in Attachment Seven), the Recommended Design Criteria Manual for Wastewater Collection and Treatment Facilities (SDDENR, March 1991 Edition) and the Recommended Standards for Wastewater Facilities (Wastewater Committee of the Greater Lakes, 2014 Edition, also known as the 10 State Standards) to establish design criteria and standards. • The project’s geotechnical report shall be included within the Conceptual Project Design Report and include soil classifications, N values, water levels, proctors, CBR’s, resistivity tests, and testing recommendations. • Investigate the current condition of the existing pumps and recommend replacement and/or rehabilitation plans. If pumping modifications are required, an amendment will be submitted for pump design and specifications, as well as associated electrical work with new pumps. • Assess the current surge anticipator valve for functionality and compatibility with proposed force main sizes. • Review of the existing oxygen delivery system with proposed force main operations. Engineer to prepare technical specification. • Evaluation and incorporation of rehabilitation recommendations of the existing vortex manhole (City Facility ID K5-98) south of the Elk Vale Lift Station. • Evaluation and incorporation of ice pigging stations, as deemed necessary, on the new force main for future ice pigging operations. • A probable opinion of construction costs for the project(s) shall be included. The costs shall be itemized based on the City’s standard bid items and appropriate contingency item allowance. • Review of compliance with City’s Standard Specifications for construction of the project(s) including sections 8A and 8B. • Identify the existing right-of-way (ROW) and easement location and any ROW or easements necessary for the Project. Include size and extent of such ROW and easements and contact information of property owners. • Submit two (2) copies and a PDF version of the Conceptual Design Report and preliminary plans and specifications to City of Rapid City’s project manager for review and comment. Preliminary Plans and Specifications will include separate force main and lift station facility packages.
Appears in 1 contract
Sources: Professional Services
Conceptual Design Report. Prepare a Conceptual Design Report: The report will consultant shall establish and indicate project specific design criteria and standards within the Conceptual Design Report (including ADA requirements)Report. Include The consultant shall submit all design assumptions for pipe sections, water, sewer, and storm sewer locations, pavement sections, etc. The Conceptual Design Report shall evaluate and recommend pavement design, preliminary horizontal and vertical alignments for utilities, roadways, project phasing and limits, and other public improvements. Establish pipe sizes, design lifelane configurations, design criteriadrainage system capacity, and reference of design resourcescomplete water quality assessment, etc.. Engineer shall use . Provide justification for the City Infrastructure Design Criteria Manual, Supplemental Criteria (Included in Attachment Seven), the Recommended Design Criteria Manual for Wastewater Collection facility and Treatment Facilities (SDDENR, March 1991 Edition) and the Recommended Standards for Wastewater Facilities (Wastewater Committee analysis of the Greater Lakes, 2014 Edition, also known as the 10 State Standards) to establish design criteria and standardsalternatives. • The project’s geotechnical report shall be included within the Conceptual Project Design Report and include soil classifications, N values, water levels, proctors, CBR’s, resistivity tests, pavement design, and testing recommendations. • Investigate The Consultant shall elaborate on other project components as necessary. An opinion of probable construction cost for the current condition of the existing pumps and recommend replacement and/or rehabilitation plansproject shall be included. If pumping modifications are requiredA separate, an amendment conceptual (no design will be submitted for pump design and specifications, as well as associated electrical work with new pumps. • Assess completed) cost estimate that contemplates the current surge anticipator valve for functionality and compatibility with proposed force main sizes. • Review construction of the existing oxygen delivery system with proposed force main operations. Engineer to prepare technical specification. • Evaluation and incorporation of rehabilitation recommendations of the existing vortex manhole (City Facility ID K5-98) south of the Elk Vale Lift Station. • Evaluation and incorporation of ice pigging stations, as deemed necessary, on the new force main for future ice pigging operations. • A probable opinion of construction costs for the project(s) shall an urban section will also be included. The costs shall be itemized based on the City’s standard bid items and appropriate contingency item allowance. • Review The consultant shall establish and indicate project specific design criteria and standards within the Conceptual Design Report. Use the City Infrastructure Design Criteria Manual to establish design criteria and standards. The Conceptual Design Report shall provide review of compliance with City’s Standard Specifications for construction of the project(s) including sections 8A and 8B. • project. Identify the existing right-of-way (ROW) and easement location and any ROW or easements necessary for the Project. Include size and extent of such ROW and easements and contact information of property owners. • ROW will be acquired as necessary to achieve a 100 foot ROW width for the length of the project corridor. Identify all non-conforming water and sewer service lines and include a map showing a proposed solution to making them conform with the City’s current standards. Submit two one (21) copies copy and a PDF version of the Conceptual Design Report and preliminary plans and specifications to City of Rapid City’s project manager for review and comment. Preliminary Plans and Specifications will include separate force main and lift station facility packages.
Appears in 1 contract
Sources: Professional Services