Conceptual Development Plan Sample Clauses

A Conceptual Development Plan clause outlines the initial vision, objectives, and general framework for a proposed project or development. It typically details the intended use, scope, and key features of the project, serving as a reference point for future planning and approvals. For example, it may specify the types of buildings, amenities, or infrastructure to be included, without finalizing detailed designs. The core function of this clause is to establish a shared understanding between parties at an early stage, ensuring alignment and providing a basis for more detailed planning and decision-making as the project progresses.
Conceptual Development Plan. Developer shall have provided to City either (i) an updated Conceptual Development Plan for the Development Site showing the then current anticipated Commercial Improvements or (ii) a statement indicating that there are no updates to then current Conceptual Development Plan.
Conceptual Development Plan. Development of the Property shall be controlled by the terms and provisions of this Seventh Amendment and the Conceptual Development Plan (“CDP”), attached hereto as Exhibit “B”, for the Property which generally depicts the planned layout of public roads, lots, amenities, and other planned features or improvements to the Property and demonstrates the lot coverage requirements available to lot owners within the Property. In the event of a conflict between the terms and provisions of this Seventh Amendment and the graphic illustrations of the CDP, the Seventh Amendment shall control. If the Seventh Amendment is silent regarding a particular subject or requirement, such silence shall not be construed as a conflict with the CDP. If the CDP and the Seventh Amendment fail to address a particular subject or requirement, the Development Agreement, as amended, shall control. If the Development Agreement, as amended is silent then the applicable City ordinances in effect at the time of development, as defined by the City of Port Orange Land Development Code (“LDC”) shall control. The parties acknowledge that compliance with the City’s LDC may necessitate modification to the CDP. In the event modification to comply with the LDC is required, and the modifications to the CDP are not in conflict with the textual provisions of this MDA and any City ordinances not superseded by this MDA, the modifications shall be deemed “minor” and may be approved without formal amendment of this MDA. Minor modifications shall require the City Administrative Official’s written approval. If the Owners are not satisfied with the suggested resolution of any problem or the decision by the City Administrative Official categorizing the modification as minor or major, the Owners may appeal the decision to the Planning Commission. Appeals from the Planning Commission may be made to the City Council. The Owners shall provide a written notice in the covenants and restrictions and in each contract for sale and purchase of lots in the Property stating the following: “Accessory structures shall not be permitted to be located in the perimeter landscape buffers established in the Development Agreement, as amended. Buildings on the lots shall not be permitted to exceed the total building lot coverage requirements established in Section 4 of the Seventh Amendment to the Development Agreement, as amended.”
Conceptual Development Plan. A Conceptual Development Plan, showing general site layout, building design and proposed construction specifications of all facilities, must be submitted with the proposal. The Conceptual Development Plan should also describe the Proposer’s general plans for management, organization, marketing, operations and financing. The Conceptual Development Plan should contain a level of detail sufficient to allow the University to determine with specificity Proposer’s intentions, evaluate the proposal for compliance, and compare the proposal to other proposals on a competitive basis. The Conceptual Development Plan shall include, at a minimum, the following information: i. A marketing plan, including the target clientele. ii. A description of improvements proposed to be constructed on the parcel, including but not limited to buildings, utilities, waste disposal systems and walkways. iii. A site plan depicting all proposed improvements. iv. The time frame for construction of all proposed improvements. v. A list of permits required for development and operation of the project. vi. A management and organization plan, including, at a minimum, names and general experience of key managers, and total number of anticipated personnel. vii. An operating plan, including a general description of the nature and scope of the operations, services to be offered, season of operation and anticipated annual number of guests or patrons. viii. A financing plan evidencing Proposer’s financial ability to meet the financial requirements of the proposal and identifying the source of investment capital and the names and addresses of all individuals proposed to have a security interest in the project. The successful Proposer will be required to submit to the University a detailed and thorough Development Plan for approval prior to commencing operations. The successful Proposer shall be responsible for compliance with all federal, state and local laws and regulations. Therefore, it is recognized that the Conceptual Development Plan required as part of this RFP may be modified by the Proposer after entering into a lease agreement with the University and having had the opportunity to more fully evaluate engineering and other technical aspects of the project.
Conceptual Development Plan. The conceptual development plan for the Project attached as Exhibit C to this Agreement, which describes the Parties’ intent with respect to the uses and other development matters affecting the Project and which is intended to establish a general conceptual framework within which the Site Development Plan and plats for the Project will be formulated, processed, adopted and implemented.
Conceptual Development Plan. Conceptual Development Plan" means ▇▇▇▇▇▇'s narrative conceptual plan for the Initial Projects attached hereto as Exhibit C.
Conceptual Development Plan. An expected development schedule. If no development has occurred on the ZDA subject parcel within the time identified, the Planning & Zoning Commission and City Council may review the original ZDA development requirements and Conceptual Development Plan to ensure their continued validity. If the City determines the concept is no longer valid, then:
Conceptual Development Plan. The Conceptual Development Plan sets forth Developer’s current plan for development of the Property. The parties acknowledge that the Conceptual Development Plan initially attached to this Agreement reflects the parties’ general intent regarding development of the Property, and that as Developer finalizes its plans and in the event it determines any parts of the Conceptual Development Plan are not feasible or otherwise require modification including as may be necessary to accommodate any unforeseen factors, events or unexpected occurrences (including, without limitation, changes in market conditions), the Conceptual Development Plan may be amended from time to time subject to approval of the City’s Community Development Department, which approval will not be unreasonably withheld, conditioned or delayed as long as the revised Conceptual Development Plan does not differ materially from that contained herein.
Conceptual Development Plan. The Conceptual Development Plan attached hereto as Exhibit E sets forth Developer’s current plan for development of the Property. City hereby approves the Conceptual Development Plan. The parties acknowledge that the Conceptual Development Plan initially attached to this Agreement reflects the parties’ general intent regarding development of the Property, and that as Developer finalizes its plans and in the event it determines any parts of the Conceptual Development Plan are not feasible or otherwise require modification, the Conceptual Development Plan may be amended from time to time subject to approval of the City, which approval will not be unreasonably withheld, conditioned or delayed as long as the revised Conceptual Development Plan does not differ materially from that contained herein. If at any time after the Effective Date of this Agreement, the Developer determines that it is not economically or otherwise feasible for the Phase III hotel to be a part of the Project, Developer agrees to promptly advise the City in writing of such determination and Developer agrees to promptly proceed with the balance of the Project, including moving to promptly complete the Public Amenities as described in Schedule 5.10 before their previously provided completion dates.

Related to Conceptual Development Plan

  • Development Plans Customer has provided Provider with a report attached hereto as Exhibit D (the “Current Development Plan”) describing in detail, as of January 1, 2017, the planned development, drilling, production, processing, treating, marketing and other activities to take place with respect to Dedicated Production and Customer Injected NGLs for the applicable Development Period. The information contained in the Current Development Plan is, with respect to the first three Years covered by the Current Development Plan, on a Quarter-by-Quarter basis, and with respect to the remaining Years covered by the Current Development Plan, on a Year-by-Year basis. The Current Development Plan attached hereto has been approved by the Parties. (a) From time to time during each Year of the Term, the Parties shall meet to discuss the planned development, drilling, production, processing, treating, marketing and other activities that Customer expects to take place with respect to Dedicated Production and Customer Injected NGLs for the then-applicable Development Period. Customer and Provider shall each make their respective representatives available to participate in such meetings and discussions. No later than August 1 of each such Year, Customer shall provide (or cause to be provided) to Provider a proposed update of the then-currently agreed Development Plan, prepared on the same basis as the Current Development Plan and describing in detail the planned development, drilling, production, processing, treating, marketing and other activities to take place with respect to Dedicated Production and Customer Injected NGLs for the then-applicable Development Period (any such update, an “Updated Development Plan” and, together with the Current Development Plan, each, a “Development Plan”). (b) Each proposed Development Plan shall include information as to the following, in each case, broken out, with respect to the first three Years covered by such Development Plan, on a Quarter-by-Quarter basis, and, with respect to the remaining Years covered by such Development Plan, on a Year-by-Year basis: (i) forward-looking production estimates for the applicable time period covered by such Development Plan for all Customer Gas and Customer Injected NGLs (A) that Customer reasonably and in good faith believes will become owned or Controlled by Customer during the time period covered by such Development Plan, and/or (B) that will be produced from (I) in the aggregate, all ▇▇▇▇▇ then-existing and (II) in the aggregate, all ▇▇▇▇▇ that are expected to be drilled during the time period covered by such Development Plan (each such Well reflected in such Development Plan, a “Planned Well” and, such collective estimates described in subsections (A) and (B), both with respect to a particular Quarter and an entire Year, the “Dedicated Production Estimates”); TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). (ii) (A) each new receipt point (including the location thereof) proposed by Customer with respect to the Dedicated Production Estimate reflected in such Development Plan (each such receipt point, a “Planned Receipt Point”), (B) each Receipt Point at which Customer expects to Tender Customer Gas or Customer Injected NGLs reflected in such Development Plan into the TGP System, and (C) the estimated portion of the Dedicated Production Estimate contained in such Development Plan that Customer expects to Tender at each such Receipt Point and Planned Receipt Point; (iii) (A) each new delivery point (including the location thereof) proposed by Customer with respect to the Dedication Production Estimate reflected in such Development Plan (each such delivery point, a “Planned Delivery Point”), (B) each Delivery Point at which Customer expects to Nominate Customer Residue Gas or Customer NGLs produced from the Dedicated Production Estimate reflected in such Development Plan to be redelivered to Customer, and (C) the estimated volumes of Customer Residue Gas and Customer NGLs produced from the Dedication Production Estimate contained in such Development Plan that Customer expects to Nominate to each such Delivery Point; (iv) the earliest date on which each Planned Receipt Point and Planned Delivery Point included in the Development Plan is required by Customer to be placed into service, which date shall not be earlier than three Months after the January 1st that is immediately subsequent to the date that the Development Plan that initially reflected such Planned Receipt Point or Planned Delivery Point was delivered to Provider hereunder; (v) the anticipated characteristics of the production from the ▇▇▇▇▇ and Planned ▇▇▇▇▇ reflected in such Development Plan (including liquids content and gas and liquids composition) and the projected production volumes and production pressures applicable thereto; provided that Customer may utilize the existing and historical production information from similarly situated ▇▇▇▇▇; (vi) any (A) proposed revision to the then-existing Dedicated Area and/or any then-existing Dedicated Contract and/or (B) any new contract that Customer proposes to be a Dedicated Contract; and (vii) other information reasonably requested by Provider that is relevant to the design, construction, and operation of the TGP System, including (A) any applicable Plant Expansion or Facilities Modification proposed by Customer, (B) the relevant Receipt Point and Planned Receipt Point facilities applicable to such Development Plan, and (C) the relevant Delivery Point and Planned Delivery Point facilities applicable to such Development Plan. TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**).

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.