Condition Surveys. 6.1 The Parties agree that the Parties will carry out a joint condition surveys of the Road Condition Survey Area prior to Implementation. 6.2 Following completion of the first survey, the Parties will: 6.2.1 agree the extent of any initial resurfacing works if required in order to provide an acceptable road condition for the traffic associated with the Wylfa Newydd DCO Project; 6.2.2 jointly agree the cost of those initial resurfacing works; 6.2.3 agree a schedule of monitoring and periodic joint inspections of the Road Condition Survey Area during the Construction Period, which shall include provision for a jointly prepared final survey report which must: (a) be undertaken within [60 Working Days] of commencement of Operation of Unit 2; (b) identify any repair works needed to repair the Road Condition Survey Area an acceptable road condition as a result of the Wylfa Newydd DCO Project; 6.3 The Parties agree that the total cost of the initial resurfacing works and any final repair works will not exceed £250,000 (Two Hundred and Fifty Thousand Pounds).
Appears in 2 contracts
Sources: Dco S.106 Agreement, Dco S.106 Agreement
Condition Surveys. 6.1 The Parties agree that the Parties will carry out a joint condition surveys of the Road Condition Survey Area prior to Implementation.
6.2 Following completion of the first survey, the Parties will:
6.2.1 agree the extent of any initial resurfacing works if required in order to provide an acceptable road condition for the traffic associated with the Wylfa Newydd DCO Project;
6.2.2 jointly agree the cost of those initial resurfacing works;
6.2.3 agree a schedule of monitoring and periodic joint inspections of the Road Condition Survey Area during the Construction Period, which shall include provision for a jointly prepared final survey report which must:
(a) be undertaken within [60 Working Days] of commencement of Operation of Unit 2;
(b) identify any repair works needed to repair the Road Condition Survey Area an acceptable road condition as a result of the Wylfa Newydd DCO Project;
6.3 The Parties agree that the total cost of the initial resurfacing works and any final repair works will not exceed £250,000 (Two Hundred and Fifty Thousand Pounds).. SCHEDULE 8 HEALTH AND WELLBEING