Connecting Utilities Clause Samples

The Connecting Utilities clause defines the responsibilities and procedures for establishing connections to essential services such as water, electricity, gas, and telecommunications at a property or project site. Typically, this clause specifies which party—often the owner, tenant, or contractor—is responsible for arranging and paying for the installation and activation of these utility services, and may outline timelines or coordination requirements with utility providers. Its core practical function is to ensure that all necessary utilities are connected in a timely and organized manner, thereby preventing delays and disputes over responsibility or costs related to utility connections.
Connecting Utilities. Utilities which are individually metered must be connected in Residents' names and Residents are responsible for notifying the utility provider with any changes and move-out date so the meter can be timely read. In certain areas, Residents may be able to choose between utility providers. If Residents choose to use a different provider than that of Owner, Residents must provide Owner with written notice and must pay any applicable provider fees, including but not limited to, changing the service back to Owner's name after Residents move out. Owner will attach an addendum to this Agreement if a utility is sub-metered or pro-rated by an allocation formula.
Connecting Utilities. Without the prior written consent of the Company, the Board will not itself, at any time during which the Company is not in default hereunder, (a) except as provided in Section 8.5 of the Indenture, sell, convey or otherwise dispose of all or any part of the Project (except to the Company as hereinabove provided), (b) except as provided in Section 9.2 hereof, mortgage or otherwise encumber the Project or any part thereof, or (c) except as provided in Section 8.5 of the Indenture, dissolve or do anything that will result in the termination of its corporate existence. The Board will, however, grant such utility, access and other similar easements over, across or under the Project Site as shall be requested by the Company and as in the judgment of the Company are necessary or convenient for the efficient operation of the Project. The Company may, at its own expense and without any consent of the Board or the Trustee, connect or "tie in" utility or other similar facilities serving the Project to utility or other similar facilities serving real property adjacent to or near the Project, but only if such connection or "tie in" of utility or similar facilities will not unreasonably interfere with the use of the Project.

Related to Connecting Utilities

  • Shifting of obstructing utilities The Contractor shall, in accordance with Applicable Laws and with assistance of the Authority, undertake the work of shifting of any utility (including electric lines, water pipes, gas pipelines and telephone cables) to an appropriate location or alignment, if such utility or obstruction adversely affects the execution of Works or Maintenance of the Project Highway in accordance with this Agreement. The cost of such shifting, as per estimates prepared by the entity owning the utility and approved by the Authority, shall be reimbursed by the Authority to the Contractor. The scope of work of such shifting of Utilities shall be as indicated in Schedule-B-1. In the event of any delay of such shifting on the part of the contractor, no extension of time for completion of the project and no claims, in any manner, shall be admissible on this account against the Authority. The work of shifting of Utilities can be taken up by the Contractor any time after signing of the Agreement.

  • Existing utilities and roads Notwithstanding anything to the contrary contained herein, it shall be the responsibility of the Contractor to ensure that the respective entities owning the existing roads, right of way, level crossings, structures, or utilities on, under or above the Site are enabled by it to keep them in continuous satisfactory use, if necessary, by providing suitable temporary diversions with the authority of the controlling body of that road, right of way or utility.

  • New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority. (ii) The Authority may, by notice, require the Contractor to connect any adjoining road to the Project Highway, and the connecting portion thereof falling within the Site shall be constructed by the Contractor at the Authority’s cost in accordance with Article 10. (iii) The Authority may by notice require the Contractor to connect, through a paved road, any adjoining service station, hotel, motel or any other public facility or amenity to the Project Highway, whereupon the connecting portion thereof that falls within the Site shall be constructed by the Contractor on payment of the cost. The cost to be paid by the Authority to the Contractor shall be determined by the Authority’s Engineer. For the avoidance of doubt, in the event such road is to be constructed for the benefit of any entity, the Authority may require such entity to make an advance deposit with the Contractor or the Authority, as the case may be, of an amount equal to the estimated cost as determined by the Authority’s Engineer and such advance shall be adjusted against the cost of construction as determined by the Authority’s Engineer hereunder. (iv) In the event construction of any Works is affected by a new utility or works undertaken in accordance with this Clause 9.3, the Contractor shall be entitled to a reasonable Time Extension as determined by the Authority’s Engineer.

  • Connections You are responsible for obtaining and maintaining all telecommunications, broadband and computer equipment and services needed to access and use Hosted Services, and for paying all associated charges.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call ▇-▇▇▇-▇▇▇-▇▇▇▇). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.