Connectivity to the grid. The Developer shall be responsible for power evacuation from the Pumped Hydro Storage based Energy Storage System (PHESS) to the designated nearest Interconnection Point/ Delivery Point/s as per the inter connection approval given by the STU (Maharashtra)/CTU.
Appears in 2 contracts
Sources: Pumped Hydro Energy Storage Facility Agreement, Pumped Hydro Energy Storage Facility Agreement