Common use of Consistent with Section Clause in Contracts

Consistent with Section. 5.2.1 of this Agreement, all project engineering and design work shall be per the Connecting Transmission Owner’s Engineering, Design & Construction Standards. Consistent with Section 5.2.3 of this Agreement, all of the Transmission Developer’s engineering and design documentation shall be approved by the Connecting Transmission Owner. The work for the NUFs shall be per the Connecting Transmission Owner’s standards and under the supervision of a Connecting Transmission Owner’s FCM, unless the NUFs are to be owned by the Transmission Developer, in which case, the Transmission Developer’s standards will apply. A list of engineering contractors and substation construction contractors currently approved by the Connecting Transmission Owner is available. However, the Transmission Developer may propose an alternate engineering contractor and/or substation construction contractor for review and acceptance by the Connecting Transmission Owner. In addition, Transmission Developer shall: Provide control plan, maintenance plan, or emergency callout plan for their stations; Coordinate relay testing between the Connecting Transmission Owners that connect to the Transmission Developer’s stations; and Coordinate and plan who will report on all 115 kV and above line faults associated with the Transmission Project and how that will be coordinated between the Transmission Owners and Transmission Developer. Protection Considerations: The protection used for the two lines from Kintigh to ▇▇▇▇▇▇▇▇ should be identical. This will require identical SEL and GE relays to be used for the A and B systems at each end of each line as well as same for all associated communications equipment for high speed line protection and direct transfer trip. The protection used for the line from ▇▇▇▇▇▇ to East ▇▇▇▇▇▇ will require A and B line differentials with diverse fiber cables. This will require identical SEL and GE relays to be used for the A and B line diff systems at each end of the line as well as same for any additional associated communications equipment for direct transformer trip needed. The protection used for the line from Dysinger to East ▇▇▇▇▇▇ should meet similar standards to that for other comparable lines.

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement