Construction Limits. (a) The limits of land for the Works are shown on the Authority’s Drawings. The Contractor shall design the Works to be contained totally within these limits, respecting the regulations concerning construction and property boundaries of the local Authorities. In the event that the Contractor, having used his best endeavours, is unable to design the permanent works and utilities to be contained totally within these limits, then the Authority will obtain the necessary additional land or the Contractor may be required to redesign the structure as instructed by the Engineer, at no extra cost to the Authority. (b) The limits of land as shown in the Authority’s Drawings may undergo changes after final survey and the Contractor shall make any adjustments necessary to the design to acknowledge the changes to the limits as then defined.