Construction Sequence Clause Samples
The Construction Sequence clause defines the order and timing in which various construction activities must be performed on a project. It typically outlines the logical progression of tasks, such as site preparation, foundation work, structural framing, and finishing, and may specify dependencies between activities or milestones that must be met before subsequent work can begin. By establishing a clear sequence, this clause helps coordinate the efforts of different trades, minimizes delays, and ensures that the project proceeds efficiently and safely.
POPULAR SAMPLE Copied 2 times
Construction Sequence. (7-1-95) (Rev. 8-21-12) 560 SP1 R34R Pave each section of roadway begun in a continuous operation. Do not begin work on another section of roadway unless satisfactory progress is being made toward completion of intersections and all other required incidental work by satisfactorily furnishing additional paving equipment and personnel, except for milling and patching operations. (6-19-12) (Rev. 10-21-14) 605, 609, 610, 650, 660 SP6 R01 Revise the 2012 Standard Specifications as follows: Apply tack coat uniformly across the existing surface at target application rates shown in Table 605-1. New Asphalt 0.04 ± 0.01 Oxidized or Milled Asphalt 0.06 ± 0.01 Concrete 0.08 ± 0.01 Apply tack coat at a temperature within the ranges shown in Table 605-2. Tack coat shall not be overheated during storage, transport or at application. Warm mix asphalt (WMA) is allowed for use at the Contractor’s option in accordance with the NCDOT Approved Products List for WMA Technologies available at: PG 64-22 300ºF 225 - 275ºF PG 70-22 315ºF 240 - 290ºF PG 76-22 335ºF 260 - 310ºF
Construction Sequence. Work to be done requires specific installation sequencing to maintain service to customers during all phases of construction. Contractor and MTS shall closely coordinate the necessary shutdowns, which shall be performed by MTS crews. Contractor shall submit for approval the sequence of work. ADD construction sequence special requirements here, if applicable
Construction Sequence. (7-1-95) (Rev. 8-21-12) 560 SP1 R34R Pave each section of roadway begun in a continuous operation. Do not begin work on another section of roadway unless satisfactory progress is being made toward completion of intersections and all other required incidental work by satisfactorily furnishing additional paving equipment and personnel, except for milling and patching operations.
Construction Sequence. The Engineer shall consider the requirements for construction staging and traffic control throughout the development of schematic design to ensure that the proposed design can be constructed. The Engineer shall provide construction phasing assumptions to the State as requested.
Construction Sequence. The Engineer shall consider the requirements for construction and traffic control DocuSign Envelope ID: 0EF7DD01-5DEF-492D-AF48-72F6373D49D2 DocuSign Envelope ID: 973D3771-56AD-4A37-8E90-25E408E93E1A throughout the development of schematic design so that the proposed design can be constructed.
Construction Sequence. (Rev. 7-07-2016) 560 SP1 R34R (REV.) The Contractor shall construct the project according to the following sequence:
Construction Sequence. The Allottee(s) acknowledges, confirms and agrees as follows:
10.4.1 That subject to the other provisions herein and provided that the Stipulated Completion Date specified herein is adhered to, the Promoter shall be at liberty to commence, proceed with or sequence the construction of the buildings in the Project and the Apt. as per the Promoter’s time-tables and schedules that could depend on and be dictated by engineering/ technical requirements and exigencies at the site.
10.4.2 That the construction of certain components of the Amenities and external, areas/ portions/ work(s) in the Project could be completed after the Stipulated Completion Date, but not later than 90 days therefrom.
Construction Sequence. The construction sequence was developed to allow work activities to commence as soon as the materials with the shortest lead times become available. Our Project Manager will work closely with the designated representative from the Customer on a regular basis to ensure that all work activities commence and continue with the least possible intrusion into any planned or scheduled activities. SitelogIQ will examine and address any concerns or potential conflicts thoroughly and will maintain reasonable flexibility in those schedules to allow the Customer to request reasonable changes needed as a result of events or unforeseen commitments of spaces. Following project completion, SitelogIQ will deliver as-built documentation, and operations and maintenance (O&M) documents to the Customer and schedule and facilitate training sessions for facilities personnel. SitelogIQ will coordinate and schedule final inspections and acceptance by the Customer as each major component of the project is completed. The following schedule outlines milestone dates associated with the submittal process, the construction/installation phase, and the training/commissioning phase. Subcontract Award Jan.10, 2022 to January 28, 2022 Submittal review and approvals Jan 28, 2022 to Feb. 25, 2022 Equipment and material procurement March 2022 through July 2022 Construction June 1, 2022 to August 20, 2022 Final construction, cleanup and startups August 1, 2022 to August 20, 2022 Punchlist and Close out August 15, 2022 to October 2022 Training and Commissioning September-November 2022 November 22, 2021 Schedule G - Page 1 The purpose of this document is to communicate the process and scope for commissioning services associated with the project. Confidence in building performance is created by executing the commissioning plan contained herein. The commissioning (Cx) process executes the testing necessary to verify the project design, contractor and vendor performance, and the baseline performance of the installed systems. This documentation verifies the use of proper construction processes and documents resultant system and building performance. These data provide a comparative basis for analysis of the building performance over time. The commissioning process is summarized as follows: ⮚ Define desired performance criteria. ⮚ Prove design compliance with performance criteria. ⮚ Collect actual performance data. ⮚ Distill results into useful information. ⮚ Strategize optimal performance. ⮚ Take actio...
Construction Sequence. The Engineer shall consider the requirements for construction staging and traffic control throughout the development of schematic design modification to ensure that the proposed design modification can be constructed in the areas between US 90 and the ▇▇▇▇▇▇ River and the vicinity of the ▇▇▇▇ ▇▇▇▇/▇▇▇ ▇▇▇▇▇▇▇▇ Intersection. The Engineer shall provide construction phasing assumptions to the State as requested.
Construction Sequence. Replace paragraphs (i), (ii) and (iii) with the following: “In all cases where kerbing and/or channelling adjoin the bituminous surface of the road, the kerbing and/or channelling may only be constructed after the bituminous surface has been completed. Before commencing with the kerbing and/or channelling, the surfacing and the base, shall be accurately cut to line with a mechanical saw to a minimum depth of 75mm. After excavation the concrete shall then be cast against the cut surface without formwork. All material outside the cut line must be carefully removed to the required thickness of concrete without damaging the edge before commencing with the casting of the concrete. No payment shall be made for repair work as instructed by the engineer to damage caused by the cutting/excavating process of surfacing and base layers. Any concrete spilt onto the surfacing shall immediately be removed and cleaned. Where so required by the engineer, the contractor shall, without any additional compensation, paint emulsion over the stained surface. Add the following sub clause: